background image

State: 04.12.2020 p. 2

Mounting instructions for multiplay „ascendo 2 robinia“

Item-No. 51 7510 601

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 2).  

Note: 

Due to possible overheating, do not place the slide surface southernly.

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundations as shown in diagram 3. After 

excavation compress the foundation floor.

 

Note:

The combination equipment is installed at play level. Pay attention to 

items marked „play level” at play equipment!

4.  Set up the concrete foundations according to diagram 3 with central, horizon-

tal reinforcement.

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

6.  Clean the surface of the foundations and start with the installation of the play 

equipment.           

Diagram 2:Top view

Reinforcement plan: 

Concrete foundation with reinforcement

Foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25-C25/30

 2000 

 R1500 

 R1500 

 R1000 

 2630 

 1504 

 1504 

 8400 

 1500 

 R1500 

 R1500 

 1538 

 R1000 

 8500 

 4000 

 2500 

 10000 

Aufprallfläche

Impact area

mind. Fallschutzplatten

min. required safety slabs

Fallschutzplatten

required safety slabs

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

ascendo 2A

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

Rev

Änderung

Datum

1:50

A3

Name

Name

Draufsicht

1028-00-00

Maßstab

Mattheis

03.05.17

 

 

a Mindestraum geändert

24.05.17 DB

SI

01.12.20

Aufprallfläche angepasst

B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Summary of Contents for ascendo 2 robinia

Page 1: ...51 7510 601 stilum GmbH Gewerbegebiet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved climbing arc tower wobble bridge slide climbing slant fireman s pole climbing wall rail post post shoe Diagram 1 Overall view of the play equipment ...

Page 2: ...ing period of 10 14 days depending on weather conditions and foundation size fill up and compress the holes between the foundation and the foundation hole with excavation 6 Clean the surface of the foundations and start with the installation of the play equipment Diagram 2 Top view Reinforcement plan Concrete foundation with reinforcement Foundation BSt 500S Stirrups Ø 8 mm lengthwise and cross Co...

Page 3: ... Larsheck 56271 Kleinmaischeid Deutschland Beton concrete gewachsenes Erdreich natural ground Legende stoßdämpfender Boden shock absorbing floor ES 09 09 20 stoßdämpfender Boden A Datum Änderung Rev 5392 450 400 1716 2921 A A 3656 1511 3650 4813 4031 1750 600 600 950 275 2871 1846 2904 1750 400 1100 500 1000 500 979 950 1750 561 2029 1996 711 A A 5410 6336 OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI ...

Page 4: ...enennung Gepr Blatt Datum Projekt Gez Zeichnungsnummer 1 20 A3 Name Feuerwehrstange mit Bogen 1025 11 00 Maßstab Simonis xx xx xx Gewerbegebiet Larsheck 56271 Kleinmaischeid Deutschland OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WENDET WE...

Page 5: ... 49 0 2689 92790 0 All rights and product modifications reserved Diagram 5c connection climbing slant J Diagram 5d connection wobble bridge Diagram 5a connection firemans pole Diagram 5b connection slide C C F H I J H I ascendo 1B Benennung Gepr Datum Projekt Gez Zeichnungsnummer Name Explosion 1026 00 00 Simonis xx xx xx Diagram 5e connection climbing arc ...

Page 6: ...es STAINLESS STEEL NOTE Play equipment which contain components made of stainless steel should not come with normal steel parts in contact Those steel parts may rub off and leave small steel particles in combination with moisture brown rust stains MAINTENANCE If such corrosion occur on stainless steel parts they are fine to remove with an abrasive 240 grit Please take care when transporting and se...

Page 7: ...opropyl alcohol or acetone However it should be noted that the dissolved soiling is not spread over the sur face again Do not use any chlorid or hydrochloric containing cleaning products nor scouring powder bleaching or silver polish cleaner Cleaning intervals depend on type and degree of soiling as well as on demands made on optical characteristics Therefore cleaning is advisable at intervals of ...

Reviews: