If no floor option was purchased, go to step 2.0 (Wall Assembly)
STEP 1.0
FLOOR KIT
1.0
–
FLOOR KIT
PART CODE QTY
DESCRIPTION
EP
4
End Plate 1884mm
SJ
6
Single Joist 1724mm
DJ
4
Double Joist 1724mm
100BS
72
100mm Batten screw (Heavy Duty Floor Only)
75N
56
75mm Nail (Rebated Floor Only)
65HHS
16
65mm Hex Head Screw
1.0
–
FLOOR FRAME
Fasten through EP into DJ using 3 x 100BS per join (75N on Rebated Floor)
Fasten through EP into SJ using 2 x 100BS per join (75N on Rebated Floor)
Fasten FN’s in positions shown below using 65HHS
Front
HEAVY DUTY FLOOR KIT
Heavy duty floor can be installed on unlevelled ground
–
use supplied logs to level your floor
by digging them into the ground.
Install heavy duty floor kit using (L) 4 logs
–
1 in each corner (position shown above) screw
through frame into log using 4 x 100BS per corner
Ensure floor frame is square by measuring from corner to corner diagonally prior to
installing flooring. Screw frames together using 6x65hhs
Yellow Tongue
DJ
DJ
SJ
SJ
SJ