background image

16985

STOP!

STOP!

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-800-577-9663

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

Summary of Contents for HEARTLAND 16985

Page 1: ...or product information call our toll free number 1 800 577 9663 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM...

Page 2: ...This page intentionally left blank...

Page 3: ...and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits S...

Page 4: ...ssembly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and...

Page 5: ...OR TRIM 2 Quart Use 100 acrylic latex exterior paint REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT The included floor has been designed for general use Depending on your specific use you may want to...

Page 6: ...7 6 x 244 cm x6 PT 2 x 3 x 13 5 x 7 6 x 33 cm x7 RK 2 x 3 x 68 5 x 7 6 x 173 cm x5 OT 2 x 3 x 66 1 2 5 x 7 6 x 169 cm x5 FZ 2 x 3 x 29 1 2 5 x 10 x 75 cm x1 BJ 2 x 3 x 24 1 16 5 x 7 6 x 61 cm x1 KK 2...

Page 7: ...94 1 2 0 9 x 20 x 240 cm 3 8 x 48 x 72 1 x 122 x 183 cm 3 8 x 15 7 8 x 72 1 x 40 x 183 cm 3 8 x 7 7 8 x 46 1 2 0 9 x 20 x 118 cm Roof Panels are 7 16 11 mm thick Left Door Right Door x1 x1 1 1 2 x 2...

Page 8: ...cm 2 5 0 cm 2 5 0 cm 1 1 4 3 2 cm 1 1 2 3 8 cm 1 2 5 cm 3 4 19 mm SHELF WINDOW PARTS LIST FASTENERS HARDWARE BAG Shown actual size NAIL BOXES Shown actual size DOOR HARDWARE Not actual size BE 3 4 19...

Page 9: ...positioned to the outside of the siding where they serve the dual purpose of framing and trim 8 The EZ Frame design transfers the roof load to the front and back walls allowing for reduced framing at...

Page 10: ...best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED...

Page 11: ...t on a concrete slab refer to the diagram below A treated 2 x 4 5 x 10 cm sill plate is required when installing your shed on concrete Hint Purchase full length treated lumber Use a high quality exter...

Page 12: ...97 2 cm 358 1 cm 236 2 cm 93 236 2 cm 93 236 2 cm 48 Center on marks Stagger Seams Flush Flush Flush Flush 1 Orient parts as shown on flat surface Measure and mark Secure using 2 3 nails at each mark...

Page 13: ...areness by measuring diagonally across the corners If the measurements are the same the frame is square The diagonal measurement will be approximately 170 9 16 433 2 cm When the frame is level and squ...

Page 14: ...square by installing 1 panel and squaring frame Check that the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The me...

Page 15: ...urement on the floor joists 5 x1 x1 x110 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm 5 8 x 45 x 96 1 6 x 114 3 x 243 8 cm 2 5 1 cm FLOOR PANELS Secure panels using 2 nails 6 apart on edges and 12 apart insid...

Page 16: ...oor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of...

Page 17: ...n Fig B Fig A 6 15 cm 2 1 2 6 4 cm 76 1 4 194 cm 76 1 4 194 cm Check for correct panel shape Edges of panel should be flush to MM Secure using 1 1 4 screws 6 apart as shown Orient parts on the flat on...

Page 18: ...o NO Secure using 1 1 4 screws 6 apart Orient parts on the flat on floor as shown Fig A B Panel should be primed side down Fig B Flush 6 15 cm NO 70 1 2 179 cm 2 x 3 x 70 1 2 5 x 7 6 x 179 cm NO FINIS...

Page 19: ...1 1 2 3 8 cm nails only 6 15 cm apart Place PT flush to KZ and edge of panel Hold the 33 1 2 measurement Secure using 1 1 2 nails 12 apart Orient KZ and PT on flat on floor as shown Place panel on KZ...

Page 20: ...re 1 1 2 nails only 6 apart Place PT flush to LF and panel edge Hold the 58 1 4 148 cm measurement and secure using 1 1 2 nails 12 apart Place the 5 8 spacer on PT Place BJ flush to spacer and nail Pl...

Page 21: ...UIRED 9 8 Secure panel using 1 1 2 nails 6 15 cm apart on edges and 12 apart inside panel Secure RK using 3 1 1 2 nails Fig A Place panel onto frame primed side up You have finished your left wall FIN...

Page 22: ...Edges of panel should be flush to MM Secure panel using 1 1 4 screws spaced 6 apart as shown Orient parts on the flat on floor as shown Fig A B Panel should be primed side down Fig B x13 1 1 4 3 2 cm...

Page 23: ...ng 1 1 4 screws spaced 6 apart as shown Orient parts on the flat on floor as shown Fig A Fig B Panel should be primed side down Fig B 2 x 3 x 70 1 2 5 x 7 6 x 179 cm NO FINISH You have finished buildi...

Page 24: ...art Place PT flush to KZ and edge of panel Hold the 33 1 2 measurement and secure using 1 1 2 nails 12 apart Orient KZ and PT on the flat on floor as shown Place panel on KZ and PT with primed side up...

Page 25: ...TS REQUIRED 7 5 6 Place the 5 8 spacer on KZ Place LF flush to spacer and secure using 1 1 2 nails 6 apart Place KZ flush on PT and secure using 1 1 2 nails 6 apart PT x1 2 x 3 x 21 1 2 5 x 7 6 x 55 x...

Page 26: ...ONT ASSEMBLY x1 Primed side up RK Fig A 2 x 3 x 13 5 x 7 6 x 33 cm x2 RK 9 8 Nail using 1 1 2 3 8 cm nails 6 15 cm apart on edges and 12 apart inside panel Secure RK using three 1 1 2 3 8 cm nails Fig...

Page 27: ...1 2 3 8 cm BACK WALL PARTS REQUIRED x5 x2 x2 x24 3 7 6 cm 2 x 3 x 66 1 2 5 x 7 6 x 169 cm 2 x 3 x 46 1 2 5 x 7 6 x 118 cm 2 x 3 x 94 1 2 5 x 7 6 x 240 cm FZ NF PR Secure using 2 3 nails at each conne...

Page 28: ...4 1 9 cm 2 Nails 2 Nails SQUARE EDGE 3 4 GAUGE BLOCK Place the 48 x 72 panel onto wall frame with primed side up as shown Note the lip and square edges Use the gauge block to mark the 3 4 measurement...

Page 29: ...imed side facing up NOTE THE SQUARE AND LIP EDGES Secure panel using 2 nails 6 apart on edges and 12 apart inside panel 4 Do not nail in groove Place end 48 panel on frame as shown with primed side fa...

Page 30: ...cm Flush Flush FRONT WALL PARTS REQUIRED x1 x1 x4 x1 x1 x18 3 7 6 cm 2 x 3 x 46 1 2 5 x 7 6 x 118 cm 2 x 3 x 94 1 2 5 x 7 6 x 240 cm NF PR Secure using 2 3 nails at each connection Orient parts on edg...

Page 31: ...ERHANG PANELS PARTS REQUIRED x4 Orient two overhang panels with the primed side up Secure panels flush to 2 x 3 x 7 7 8 using 1 1 4 screws as shown Primed side up 1 1 4 3 2 cm 2 x 3 x 7 7 8 5 x 7 6 x...

Page 32: ...to back side and ends Place overhang flush to 2 x 3 Fig A Keep overhang flush to 2 x 3 Fig B Make sure overhangs are flush to 2 x 3 the entire length Seam Flush x1 x1 Overhang Overhang Flush DOOR OPE...

Page 33: ...under overhang with primed side up as shown Fig A Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel using 2 2 nails in the corners Fig B Nail the panel using 2 nails 6 apar...

Page 34: ...ing Secure using 2 3 screws to attach Continue installing panels primed side up flush under overhang Fig A Note 1 4 offset on right panel Secure panels using 2 nails 6 apart on edges and 12 apart insi...

Page 35: ...n Angle nails to hit floor frame Fig A Secure lower edge of panel to floor frame using 2 nails 6 apart Angle nail to hit floor frame Fig A 2 Secure back wall uprights to floor using 2 3 screws Fig B 3...

Page 36: ...using 1 2 nail Fig A Center back wall on floor Ensure the measurement between the panel edge and the trim is the same along the entire length Secure using 1 2 nail in the upper corner Fig B Nail along...

Page 37: ...wall on floor side to side Be sure the measurement between the panel edge and the trim is the same along the entire length Secure wall using 1 2 nail in the upper corner Fig B Nail along the panel ed...

Page 38: ...ame Measurement 2 5 cm Nail 3 7 6 cm Screw Panel Fig E 3 7 6 cm Screw 3 7 6 cm Nails Fig F Center front wall on floor side to side Check the 64 door opening is held before nailing Nail the front wall...

Page 39: ...1 1 2 3 8 cm FRONT WALL PARTS REQUIRED x8 LV 3 7 6 cm 2 x 3 x 22 1 2 5 x 7 6 x 57 cm x2 LV 3 7 6 cm nails 2 at each connection Working inside of front wall install LV flush to window opening using 3...

Page 40: ...3 cm x1 x1 RK OT Angle 3 7 6 cm screw Two 3 7 6 cm screw Remove OT RK Fig A Assemble RK to OT using 1 3 screw Fig A Use OT and RK as a temporary brace to support top plate Secure to floor using 3 scre...

Page 41: ...m corner of back wall and RK already installed as shown Secure RK on the flat square to back wall at measurement using 2 3 screws Install a second RK on edge and 3 8 thick angle trim piece as shown Fi...

Page 42: ...parts on Jig as shown You have finished building your rafters PARTS REQUIRED NU NU Gusset AD AD Ends of rafters must touch together at the peak Secure gusset to rafters using 12 2 nails in pattern sh...

Page 43: ...ut and flush with soffit Secure using 2 1 1 4 screws on both sides 2 5 8 x 5 3 8 x 5 1 2 6 6 x 13 6 x 14 cm 1 Left 1 Right x4 1 1 4 3 2 cm Your trim caps are now installed LEFT SIDE RIGHT SIDE Install...

Page 44: ...k panel trim and panel edge as shown Secure using 8 1 1 4 screws 9 apart from inside shed 2 2 x 3 x 65 5 x 7 6 x 165 cm x2 Flush Flush on trim Flush to panel NR Flush to panel edge PARTS REQUIRED x16...

Page 45: ...e as shown Secure using 6 1 1 4 screws from inside shed Repeat Steps for opposite Side Wall 3 NQ x4 2 x 3 x 46 7 8 5 x 7 x 119 cm Flush to panel Flush NQ Flush to peak PARTS REQUIRED x12 1 1 4 3 2 cm...

Page 46: ...sh to back wall and overhang Secure from under overhang using 2 2 screws Fig A Locate Rafter centered on marks Secure opposite end through panel into rafter end using 1 2 screw Fig B Screw rafters at...

Page 47: ...NISH Orient parts as shown and attach to ends of rafters using 2 2 finish nails Fig A Your soffit trim is now installed Trim is flush at ends to sidewall trim Flush Fig A KY Flush to trim at ends 3 4...

Page 48: ...tion support flush with bottom edge of top plate and side wall panel and attach with 2 5 cm nails as shown Remove temporary brace after support is installed You have finished your door frame support D...

Page 49: ...7 6 x 244 cm x1 x1 PT FINISH Secure using 2 nails spaced evenly as shown You have finished building your workbench top PT Fig A 2 x 3 temporary support Flush at ends 5 8 1 6 cm Flush at ends 10 1 2 Ap...

Page 50: ...x 244 cm PT Fig A Flush at ends Flush at ends FINISH Secure using 2 nails as shown Repeat steps to build second shelf You have finished building your shelves 7 16 1 1 cm 2 1 2 6 4 cm PT 10 1 2 Approx...

Page 51: ...244 cm x1 x1 23 7 8 x 96 61 x 244 cm Peg Board Flush at ends Flush at ends Flush FINISH Secure using 3 4 screws as shown Rough side up Rough side up Position pegboard to 1 x 3 flush at ends and edge...

Page 52: ...tach KK to upright and workbench using 4 3 screws as shown Fig A You will secure your workbench ends later Install your pegboard next 2 3 7 6 cm x10 x1 x1 x4 2 x 3 x 24 1 16 5 x 7 6 x 61 cm KK 2 5 cm...

Page 53: ...oard onto workbench with 1 x 3 Trim to bottom facing out Secure bottom of pegboard using 1 2 screw at center and 3 screws at lower corners Your pegboard is now installed 2 3 3 7 6 cm x4 x2 x1 x13 x1 2...

Page 54: ...Window Shelf PARTS REQUIRED x10 2 5 cm You will screw the ends of workbench and shelf from outside of shed Place shelf into gap in side wall upright Secure using 2 nails as shown x1 11 3 4 30 cm 10 1...

Page 55: ...S 3 7 6 cm Nail PARTS REQUIRED x8 3 7 6 cm Measure and mark outside nail locations for workbench and shelf on back wall as shown Nail through marks on wall panel into ends of workbench and shelf suppo...

Page 56: ...panel into end of shelf using 2 3 nails Your shelf is now installed Install RK flush against top plate and outer wall panel Secure using 3 screws as shown Fig A Install RK in corner flush against top...

Page 57: ...using 2 2 nails in the corners You must square the roof by attaching one panel fist You will use the panels long edge as a lever to bring your roof into square Commonly known as racking Roof panels ma...

Page 58: ...fter Fig E Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Install 47 7 8 x 48 roof panel flush to first panel flush at peak and with the 3 8 measurement on trim Fig F G 4...

Page 59: ...anel as shown flush to panels and 3 4 on rafter Fig A and with 3 8 at the gable trim Fig B Install 18 x 48 roof panel flush to panels and with the 3 8 measurement on trim Fig B and with 3 8 at the gab...

Page 60: ...8 1 cm OFFSET GREEN RED Orient parts as shown on flat surface 3 8 offset is to top Look for red right and green left on hinge board PARTS REQUIRED x1 x1 Left Door Right Door 3 5 cm x8 2 Attach tempor...

Page 61: ...ing ten 3 screws as shown Make sure screws go into framing and floor Fig D E 5 3 7 6 cm Screws into the wall support and floor frame Fig B Center 3 8 measurement on mark Fig D Fig C 3 8 1 cm Fig E Ang...

Page 62: ...ove 3 8 spacers from doors 2 BEGIN Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown Fig B Use two screws at seams 1 PARTS REQUIRED x46 Center metal th...

Page 63: ...ed installing your door weatherstrips BEGIN With left door closed center a weatherstrip OO vertically on the left door in the door opening Fig A OO will offset the left door 1 OUT past the door trim 1...

Page 64: ...bolts to extend into HINT Extend bolts to leave marks in wood Tap bolts with hammer Drill 3 8 holes deep enough for each bolt to slide into 3 2 Mount one barrel bolt flush at top of OO on left door u...

Page 65: ...r door opening COLLAR TIE PARTS REQUIRED x6 3 7 6 cm x1 2 x 3 x 68 5 x 7 6 x 173 cm OT FINISH 2 Position and level OT on rafter that is centered over door opening Install OT using 3 nails as shown You...

Page 66: ...the same You will build two shutters the same You have finished building your window shutters Install with primed side facing down 5 8 x 3 x 25 1 6 x 7 6 x 63 5 cm 5 8 x 3 x 8 1 6 x 7 6 x 20 cm x6 x4...

Page 67: ...stalling your window PARTS REQUIRED Seal window using high quality exterior grade caulk 3 Install window using 4 1 1 4 screws as shown Mark center of window frame as shown Window 23 3 4 x 16 1 2 63 x...

Page 68: ...nail at dot Nail into wall frame inside Then from INSIDE of the shed use three 3 4 screws to secure the shutter indicated at X Repeat steps to attach shutter on opposite side Locate KX centered on mar...

Page 69: ...DOOR TRIM FINISH Your door trim is now installed PARTS REQUIRED 5 8 x 4 x 14 1 6 x 10 x 35 5 cm x8 x16 3 4 19 mm Install parts WNA on lower section of door panels as shown Secure each using 2 3 4 scre...

Page 70: ...Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails...

Page 71: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 72: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 73: ...t ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 74: ...e cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5...

Page 75: ...between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 76: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...

Reviews: