background image

1 | 

P a g e

 

 

Caution

 

Please be careful when handling all components, some parts have sharp metal edges. 
Always wear work gloves, eye protection and long sleeves when assembling or maintaining 
your shed. 

Tools required for assembly 

 

Level 

 

Drill 

 

Hammer 

 

Ladder 
  

 

Phillips head drive 

 

Hex Head 

Drive (5/16’)

 

 

Safety glasses 

 

Gloves 

Before assembly 

 

Remove all parts from packages and place in a safe place close to assembly area. 

 

Check all parts on assembly parts list are included, prior to commencing assembly. 

 

Review all instructions; continue to refer to instructions throughout assembly 

 step 

by step. 

Preparing your site 

 

If you are installing your shed on the Stilla rebated floor we recommend finding a 
place in your yard that is very close to level. Pavers or a solid material that will not be 
affected by weather can be used to perfectly level the shed by placing under the 
floor frame where required, make sure all members are supported. 

 

If you are installing your shed on the Stilla heavy duty floor, this can be placed on 
unlevelled surfaces and levelled up by using the 100x100 stumps provided. 

 

Summary of Contents for Bromley 6x12

Page 1: ...nstruct your shed is included inside the pack cedar panels doors windows hardware kits roof sheeting Please ensure you fully unpack all the parts check against the parts checklist before contacting customer service about anything you believe may be missing Thank you ...

Page 2: ...arts list are included prior to commencing assembly Review all instructions continue to refer to instructions throughout assembly step by step Preparing your site If you are installing your shed on the Stilla rebated floor we recommend finding a place in your yard that is very close to level Pavers or a solid material that will not be affected by weather can be used to perfectly level the shed by ...

Page 3: ... 1 DS Door Stop 840x42x18mm 1440mm if double doors 1 RS 1150mm Roof Sheeting 10 2 Single Pans 10 2 RC 1520mm Ridge Cap 3 HK 6x12 Hardware Kit 1 IM 6x12 Instruction Manual 1 TB BB Top Batten Bottom Batten 3905mm 4 C 3905mm Channel 2 RB Ridge Beam 3516x140x35mm 1 Floor Kit Option Floor Frame Rebated Floor 70x38mm Heavy Duty Floor 140x38mm Part Code Checked Part Description Qty EP End Plate 1884mm 4 ...

Page 4: ...ws Part Code Checked Part Description Qty VR Verandah Rafter 1000x42x35mm 4 VF Verandah Fascias 1100x75x20mm 2 VS Verandah Roof Sheets 1150mm 6 B Beam 3905x70x35mm 1 VB Verandah Beam 3905x140x35mm 1 VP Verandah Posts 2400x90x90mm 2 6x12 Annex Option Add Extra Screws Part Code Checked Part Description Qty VR Verandah Rafter 1930x42x35mm 4 VF Verandah Fascias 2000x75x20mm 2 VS Verandah Roof Sheets 2...

Page 5: ...Rebated Floor Fasten through EP into SJ using 2 x 100BS per join 75N on Rebated Floor Fasten FN s in positions shown below using 65HHS Front HEAVY DUTY FLOOR KIT Heavy duty floor can be installed on unlevelled ground use supplied logs to level your floor by digging them into the ground Install heavy duty floor kit using L 4 logs 1 in each corner position shown above screw through frame into log us...

Page 6: ...ATION PART CODE QTY DESCRIPTION FB 4 Floor Board 1798x800mm FB 1 Floor Board 1798x311mm 50PS 88 50mm Philips Screw 1 1 FLOOR SHEETS Fasten floor sheets to floor frame as shown below using 50PS The x on the floor sheets do not line up with our Joists disregard ...

Page 7: ...P 1 900mm Wall panel 65HHS 3 65mm Hex head screw 2 0 ASSEMBLY WALL ASSEMBLY Screw through FP into P top centre bottom using 3 x 65HHS Holding studs flush on the outside Ensure Cedar Strip is on door side Note Ensure tongue on cedar cladding is at top P Screw 3 x 65HHS Top centre bottom FP Cedar Strip When screwing the four corners together please make sure the studs are flush on the outside not th...

Page 8: ...S WALL ASSEMBLY PART CODE QTY DESCRIPTION P 1 900mm Wall panel 65HHS 3 65mm Hex head screw 2 1 ASSEMBLY PARTS WALL ASSEMBLY Screw through P into P Top centre bottom using 3 x 65HHS holding studs flush on the inside P Screw 3 x 65HHS Top centre bottom P ...

Page 9: ...BLY PART CODE QTY DESCRIPTION P 1 900mm Wall panel 65HHS 3 65mm Hex head screw 2 2 ASSEMBLY PARTS WALL ASSEMBLY Screw through P into P Top centre bottom using 3 x 65HHS holding studs flush on the inside Repeat with last panel P Screw 3 x 65HHS Top centre bottom P ...

Page 10: ... WALL ASSEMBLY PART CODE QTY DESCRIPTION P 1 900mm Wall panel 65HHS 3 65mm Hex head screw 2 3 ASSEMBLY PARTS WALL ASSEMBLY Screw through P into P Top centre bottom using 3 x 65HHS holding studs flush on the outside P Screw 3 x 65HHS Top centre bottom P ...

Page 11: ...S WALL ASSEMBLY PART CODE QTY DESCRIPTION P 1 900mm Wall panel 65HHS 3 65mm Hex head screw 2 4 ASSEMBLY PARTS WALL ASSEMBLY Screw through P into P top centre bottom using 3 x 65HHS holding studs flush on the inside P Screw 3 x 65HHS Top centre bottom P ...

Page 12: ...S WALL ASSEMBLY PART CODE QTY DESCRIPTION P 1 900mm Wall panel 65HHS 3 65mm Hex head screw 2 5 ASSEMBLY PARTS WALL ASSEMBLY Screw through P into P top centre bottom using 3 x 65HHS holding studs flush on the outside P Screw 3 x 65HHS Top centre bottom P ...

Page 13: ...WALL ASSEMBLY PART CODE QTY DESCRIPTION WP 1 900mm Window panel 65HHS 3 65mm Hex head screw 2 6 ASSEMBLY PARTS WALL ASSEMBLY Screw through WP into P top centre bottom using 3 x 65HHS holding studs flush on the inside P Screw 3 x 65HHS Top centre bottom WP ...

Page 14: ...LY PART CODE QTY DESCRIPTION P 1 900mm Wall panel 65HHS 3 65mm Hex head screw 2 7 ASSEMBLY PARTS WALL ASSEMBLY Screw through P into WP top centre bottom using 3 x 65HHS holding studs flush on the inside Repeat with final panel P Screw 3 x 65HHS Top centre bottom WP ...

Page 15: ... QTY DESCRIPTION FP 1 Front wall panel 65HHS 3 65mm Hex head screw 2 8 ASSEMBLY PARTS WALL ASSEMBLY Screw through FP into P top centre bottom using 3 x 65HHS holding studs flush on the outside Ensure Cedar Strip is on door side P Screw 3 x 65HHS Top centre bottom FP Cedar Strip ...

Page 16: ... QTY DESCRIPTION G 2 Gable 65HHS 3 65mm Hex head screw 3 0 ASSEMBLY GABLE ASSEMBLY Carefully position G in place inserting tongue on side panels into groove in G Screw up through wall panels into bottom plate of gable using 3 x 65HHS at ends and centre Repeat Gable on other side ...

Page 17: ...ION RBB 2 Ridge bracket 50PS 4 50mm screws 3 2 ASSEMBLY RIDGE BEAM BRACKET Measure down from Gable peak 145mm and mark with pen pencil Hold ridge beam bracket RBB below mark top of bracket flush with mark and screw through bracket into gable using 2 x 50PS per bracket Repeat this step on both gables ...

Page 18: ...DGE BEAM PART CODE QTY DESCRIPTION RB 1 Ridge beam 50PS 4 50mm screws 3 3 ASSEMBLY RIDGE BEAM Place ridge beam on top of ridge beam brackets ensure beam is hard up against gable Screw up through ridge beam bracket into ridge beam using 2 x 50PS each end ...

Page 19: ...RTS ROOF ASSEMBLY PART CODE QTY DESCRIPTION BB 1 Bottom batten TB 1 Top batten R 3 Rafter 100BS 6 100mm Batten screw 3 4 ASSEMBLY ROOF ASSEMBLY Push R into BB and TB and insert 100BS into predrilled hole to fasten 1 x 100BS per join TB BB R R R TB BB ...

Page 20: ...3 5 ASSEMBLY ROOF ASSEMBLY Lay roof frame on a hard surface Position 1 roof sheet RS at each end flush at top and flush with end of roof battens Fasten roof sheets to roof frame in number sequence shown using 25RS in TB and 40RS in BB Note only screw in Pan at top and in rib at bottom TB Bent up edge at top Overhang TOP BB 1 2 3 4 Flush Bent up edge at top BB TB ...

Page 21: ... 1150mm roof sheet 40RS 5 40mm Roof screw 25RS 10 25mm Roof screw 3 6 ASSEMBLY ROOF ASSEMBLY Complete laying roof sheeting out on frame Fasten roof sheets to battens in sequence shown 1 x 25RS either side of join at top and 1 x 40RS through rib join at bottom Bent up edge at top TOP 1 2 3 4 5 8 9 10 ...

Page 22: ...20 40mm Roof screw 25RS 17 25mm Roof screw 3 7 ASSEMBLY ROOF ASSEMBLY Complete screwing roof off at top 1 x 25RS in pan beside every rib Once top complete screw bottom off using 1 x 40RS through every rib Note Use straight edge to keep all screws in line and centre of batten Bent up edge at top TOP ...

Page 23: ...ling your Lean To Annex 3 8 ASSEMBLY PARTS CHANNEL ASSEMBLY PART CODE QTY DESCRIPTION ST 6 12mm self tapping screw C 1 Roof Channel 3 8 ASSEMBLY CHANNEL ASSEMBLY Slide Roof channel onto end of roof sheeting over hang Fasten in place using ST REPEAT TASKS 3 4 3 8 TO COMPLETE THE OTHER ROOF PANEL Bent up edge at top TOP C C ...

Page 24: ...Y ROOF INSTALLATION Slide roof panel into position and fasten up through front and back gables Ensure roof rafters are flush with gables Fasten up through side wall top plates at each end and each panel join Ensure walls run parallel with bottom batten BB on roof Repeat this step for both roof panels This task will take 2 or more persons Rooves should meet at peak ...

Page 25: ... CODE QTY DESCRIPTION CT 1 Collar tie 65HHS 4 65mm Hex head screw 4 0 ASSEMBLY PARTS COLLAR TIE INSTALLATION Holding Collar tie tight and level in position screw through CT into Roof Rafter Screw through center on angle up into ridge beam If Double door option was chosen go to step 4 5 ...

Page 26: ...HS 6 Hinge Screw CD 1 Door 4 1 ASSEMBLY DOOR HINGE ASSEMBLY Place door on back and hold hinge H in position Fasten hinges to door using 3 x hinge screws HS per hinge Position Hinges are to be placed at top and bottom of door They are to be centralised over bracing on back of door as per second and third image below ...

Page 27: ...DOOR INSTALLATION PART CODE QTY DESCRIPTION CD 1 Door HS 6 Hinge screw 4 2 ASSEMBLY DOOR INSTALLATION Hold door in position 3mm down from top Front of the door when closed will be flush with front of VJ cladding Screw through hinge into front wall as pictured ...

Page 28: ...rom door edge Insert T handle in position and mark two outside holes Remove T handle and drill 2 x 6mm holes Insert T handle back in with bolts and fasten nuts on back of door STEP 4 4 DOOR HANDLE ASSEMBLY 4 4 ASSEMBLY PARTS DOOR HANDLE ASSEMBLY PART CODE QTY DESCRIPTION 1 T Handle Leaver 4 4 ASSEMBLY DOOR HANDLE ASSEMBLY Holding door in closed position flush with VJ cladding on front slide leaver...

Page 29: ...PTION H 4 Hinge HS 12 Hinge Screw CD 2 Doors 4 5 ASSEMBLY DOUBLE DOOR HINGE ASSEMBLY Place door on back and hold hinge H in position Fasten hinges to door using 3 x hinge screws HS per hinge Position Hinges are to be placed at top and bottom of door They are to be centralised over bracing on back of door as per second and third image below Repeat Step 4 5 with second door ...

Page 30: ... Hinge screw 4 6 ASSEMBLY DOUBLE DOOR INSTALLATION Hold door in position 3mm down from top Front of the door when closed will be flush with front of VJ cladding Screw through hinge into front wall as pictured Repeat steps with other door Note door centre gaps can be adjusted by unscrewing wall to floor fixing and moving in and out ...

Page 31: ...ust be installed on the opposite door to the pad bolted door fixed door STEP 4 8 DOOR HANDLE ASSEMBLY 4 8 ASSEMBLY PARTS DOOR HANDLE ASSEMBLY PART CODE QTY DESCRIPTION TH 1 T Handle 4 8 ASSEMBLY DOOR HANDLE ASSEMBLY Mark and drill 12mm centre hole in position shown 50mm in from door edge T Handle must be installed centre of the centre door brace on the back Insert T handle in position and mark two...

Page 32: ...door in closed position flush with other door slide leaver onto T Handle and tighten once hitting packer on fixed door STEP 5 0 DOOR STOP ASSEMBLY 5 0 ASSEMBLY PARTS DOOR STOP ASSEMBLY PART CODE QTY DESCRIPTION DS 1 Door Stop 40N 2 40mm nail 5 0 ASSEMBLY DOOR STOP Place door stop in position at base of door between front FP s Nail door stop down using 2 x 40n if installing on a concrete slab use a...

Page 33: ... 5 1 FIXING TO BASE Screw through base plates on wall frames in positions shown below using 65HHS screws If floor not purchased fixings are not provided If installing on a concrete slab use 100mm long 10mm round dyna bolts through frame in the same positions P Screw 3 x 65HHS Top centre bottom FP Cedar Strip ...

Page 34: ...two lines as per images below 5 2 ASSEMBLY PARTS CORNER POST ASSEMBLY PART CODE QTY DESCRIPTION CP 4 1890mm Corner post s 40N 24 40mm Nail 5 2 ASSEMBLY CORNER POST ASSEMBLY Hold corner post CP in position Fasten through corner post into wall stud using 6 x 40mm nail Spacing evenly up each corner post Repeat for all four corners ...

Page 35: ...e down this join as per images below 5 3 ASSEMBLY PARTS COVER STRIP ASSEMBLY PART CODE QTY DESCRIPTION CS 5 1890mm Cover strip 40N 30 40mm Nail 5 3 ASSEMBLY COVER STRIP ASSEMBLY Hold cover strips CS over join on wall panel Nail through cover strip into wall panel using 6 x 40mm nails 40N evenly spaced per strip ...

Page 36: ...ON 5 5 ASSEMBLY PARTS RIDGE CAP INSTALLATION PART CODE QTY DESCRIPTION RC 3 1520mm Ridge Cap 40RS 8 40mm Roof screw 5 5 ASSEMBLY RIDGE CAP INSTALLATION Slide ridge cap into position Make sure peak of ridge cap is in line with peak of fascia s Screw through ridge cap into 2nd rib in from end and through into batten Slide second and third ridge cap into position and fasten at opposite end Ensure rid...

Page 37: ... 6 ASSEMBLY PARTS 8 LOFT SHELF PART CODE QTY DESCRIPTION 8LS 1 8 Loft shelf 65HHS 7 65mm Hex head screw 5 6 ASSEMBLY 8 LOFT SHELF Holding loft shelf in position screw up through support plate into wall frame at each corner Screw through support plate into back wall panel centre of loft shelf ...

Page 38: ...ion please skip this step 6 0 ASSEMBLY PARTS LEAN TO ANNEX PART CODE QTY DESCRIPTION VB 1 Verandah beam B 1 Batten VR 4 Verandah rafter 75N 16 75mm Nail 6 0 ASSEMBLY LEAN TO ANNEX Nail through B VB into VR using 2 x 75N per join use pre drilled holes B VB VR VR VR VR ...

Page 39: ...h roof sheeting 40RS 2 40mm roof screw 25RS 2 25mm roof screw ASSEMBLY LEAN TO ANNEX Screw roof sheeting to frame using 2 x 25RS at top and 2 x 40RS at bottom Note that the top screws go into the pan of the roof sheet and the bottom screws go into the rib of the roof sheet Overhang Top Bent up edge at top ...

Page 40: ...Verandah roof sheeting 40RS 40mm roof screw 25RS 25mm roof screw 6 2 ASSEMBLY LEAN TO ANNEX Place the remaining 3 roof sheets in position and finish screwing off the top and bottom using 25RS in every pan at the top and 40RS in every rib at the bottom overlap excess sheeting Bent up edge at top TOP ...

Page 41: ...of as shown in picture Support front of verandah roof while fastening through frame into shed wall studs using 4 x 100BS Cut post to correct length Ensure there is fall down to front of verandah roof Once posts are in place and front beam is level right across screw through front beam into posts using 2 x 65HHS per post no fasteners are supplied for base of post they can either be set in the groun...

Page 42: ...MBLY PARTS LEAN TO ANNEX PART CODE QTY DESCRIPTION VF 2 Verandah fascia 40N 8 40mm nail 6 4 ASSEMBLY LEAN TO ANNEX Once fascia s are on shed trim lean to annex fascia to butt in and finish correctly Nail through fascia using 4 x 40N per fascia ...

Page 43: ...ished installing your product PLEASE NOTE THAT IF YOU DO NOT COMPLETE THIS WARRANTY REGISTRATION FORM YOUR PRODUCT IS NOT COVERED BY WARRANTY PRODUCT MAINTENANCE We highly recommend you coat the external of your product with Intergrain Stain Light Oak This product cannot be bought off the shelf but is a known mix of Ultra Deck Intergrain Cedar Cypress and a black paint This can be purchased from D...

Page 44: ...ed in your backyard Please upload this image when completing the warranty registration Alternatively you can send the photos by email to sales stilla com au If you require any assistance please feel free to call or email Kind regards STILLA Customer Support 1800 784 552 sales stilla com au ...

Reviews: