Preparation for maintenance
Jacking up
The industrial truck must be jacked up for
some maintenance work. Make sure that the
industrial truck is only jacked up on level sur-
faces, and is secured against rolling and drop-
ping.
Jacking up at the chassis
–
Position the industrial truck with the fork tips
against a wall.
–
Jack up the industrial truck until the steering
rollers are no longer in contact with the
ground.
–
Secure the industrial truck.
HPS20_25_020
Maintenance
6
Preparation for maintenance
51
50988046036 EN - 01/2021 - 01
Summary of Contents for HPT-20
Page 2: ......
Page 4: ......
Page 8: ......
Page 9: ...1 Foreword ...
Page 16: ...Foreword 1 Environmental considerations 8 50988046036 EN 01 2021 01 ...
Page 17: ...2 Introduction ...
Page 25: ...3 Safety ...
Page 33: ...4 Overviews ...
Page 37: ...5 Operation ...
Page 53: ...6 Maintenance ...
Page 68: ...Maintenance 6 Maintenance after 6 months 60 50988046036 EN 01 2021 01 ...
Page 69: ...7 Technical data ...
Page 71: ...Technical data 7 Dimensions HPT 25 HPT 25 GA HPT 25 ST HPT 30 63 50988046036 EN 01 2021 01 ...
Page 72: ...Dimensions HPT 20 FL Technical data 7 Dimensions HPT 20 FL 64 50988046036 EN 01 2021 01 ...
Page 77: ......