INSTALLATION
Preparations
www.stiebel-eltron.com
WPL ACS classic |
9
Example: Gravel bed under wall mounting support WK 1
>800
≥300
a
b
D
00000
65
66
6
1
1 Drainage pipe
Heat pump
a
b
WPL 07 ACS classic
900
865
WPL 09 ACS classic
900
865
WPL 17 ACS classic
1000
995
f
f
Lay a drainage pipe under the appliance to drain moisture
away from the building.
f
f
Create a gravel bed below the condensate drain of the
appliance.
9.3.2 Siting
Example: T-support SK 2
B
A
1
3
2
150
150
D
00000
63
48
6
1 Air intake side
2 Air discharge side
3 Main wind direction
Heat pump
A
B
WPL 07 ACS classic
865
500
WPL 09 ACS classic
865
500
WPL 17 ACS classic
995
500
418
D
00000
65
62
4