![STIEBEL ELTRON SOL BB Installation Manual Download Page 8](http://html1.mh-extra.com/html/stiebel-eltron/sol-bb/sol-bb_installation-manual_1376895008.webp)
EN
G
L
ISH
INSTALLATION
ON END
SOL BB
| 27
5.3 Fitting roof hook
8
2
_0
5_0
1
_0
0
3
5
ŷêŒäVĜ ŷêŒäVŝ
Roof hook spacing
mm 2080
-400
900
±200
1220
±200
f
Remove the roof tiles up to the next rafter or push them
to one side.
2
6
_0
5_0
1
_0
5
9
8
2
1
1 Fixing plate
2 Roof hooks
f
Secure each roof hook to the roof rafter using at least two
woodscrews.
f
Align the roof hooks. Use the support plate to compen-
sate differences in height.
f
Tie a guide line between the outer roof hooks of the
planned collector array. Align any other roof hooks to this.
f
Replace the roof tiles.
5.4 Installing the collector strip
f
Secure the collector strip to the lower roof hook through
the second hole.
f
Secure the collector strip to the upper roof hook through
a suitable slot.
2
6
_0
5_0
1
_06
4
0
9
9 M10x20 screw
5.5 Installing profile rails
3
5
2
6
_0
5_0
1
_048
4
3 Collector strip
5 Profile rail
The second and lowest hole in the collector strip are intended
for securing the profile rails.
5.5.1 Upper profile rail
f
Insert one screw on the left and one on the right side of
the channel of the upper profile rail.
f
Fit the profile rail by pushing the inserted screws through
the second hole in the collector strip.