iNSTallaTiON
Specification
www.stiebel-eltron.com
SNE 5 t ECO GB|
13
14.5 Checks
Earth conductor check
D
00000
88
57
8
f
f
Check the earth conductor on the test contact between the
water connections and on the earth conductor contact of the
power cable.
Insulation resistance
To check the effectiveness of the insulating properties of the ap-
pliance, we recommend conducting a differential current test of
the earth conductor current/leakage current.
14.6 Replacing the power cable
The power cable must only be replaced by a qualified contractor
with an original spare part.
D
00000
71
89
0
f
f
Route the power cable along the cable guide.
14.7 Positioning the temperature sensor in its
protective pipe
f
f
Insert the temperature sensor into the protective pipe.
f
f
Secure the temperature sensor in place below the earthed
plug.
15. Specification
15.1 Dimensions and connections
c06
c01
100
421
70
230
140
263
i13
14
328
D
00000
71
74
7
SNE 5 t ECO GB
c01 Cold water inlet
Male thread
G 3/8 A
c06 DHW outlet
Male thread
G 3/8 A
i13 Wall mounting bracket
15.2 Wiring diagram
1/N/PE ~ 220 - 240 V
X2
X1
L
N
LOut
L
N
Z1
Z3
X4
X3
ϑ
L N PE
D
00000
71
846