18
| SHU 10 | SH 10 | SH 15 www.stiebel-eltron.com
INSTALLATION
Preparations
7.1 Standard delivery
The following are delivered with the appliance:
- Wall mounting bracket
- Installation template
7.2 Accessories
The following accessories are available for sealed unvented op-
eration:
SHU 10 SLi | SHU 10 SL GB
- SVMT safety assembly
- Water distribution tees
- WEH sensor tap
SH 10 SLi | SH 15 SLi | SH 15 SL GB 3.3 kW
- Safety assembly KV 40 / KV 307
- Surface mounted safety assembly SRT 2
- Permanent connection set for 15 l appliances
8. Preparations
Water installation
A safety assembly is required.
Taps/valves
Only install pressure taps in conjunction with a safety assembly.
8.1 Installation site
!
Material losses
Install the appliance in a room free from the risk of frost.
!
Material losses
Mount the appliance on the wall. The wall must have a
sufficient load-bearing capacity.
Note
Make sure that the appliance is
freely accessible for maintenance work.
Always install the appliance vertically and near the draw-off point.
8.1.1 SHU undersink installation with safety assembly
!
Material losses
The appliance is only suitable for undersink installation.
The water connections of the appliance point upwards.
82
°C
35
55
65 Eco
65
400-450
500
100-200
26
�0
2�
06
�0
20
6
8.1.2 SH oversink installation with safety assembly
!
Material losses
The appliance is only suitable for oversink installation.
The water connections of the appliance point downwards.
comfor t
85
°C
35
55
65
Eco
100
124
100
D
00000
50
54
9
9. Installation
!
Material losses
When using plastic pipework observe the extreme oper-
ating and fault conditions that can occur on the appliance
(see chapter "Installation / Specification / Extreme oper-
ating and fault conditions").
f
f
Run the connections to the second tap on site, e.g. in 10 mm
copper pipe.
SHU 10 SLi | SHU 10 SL GB
f
f
To supply two washbasins, use the "water distribution
tees" (see chapter "Installation / Appliance description /
Accessories").