INSTALLATIoN
Appliance handover
22 | GWS
Examples:
7 °C
4 °C
4 °C
2 °C
Δ
ϕ
1
Δ
ϕ
2
26
�0
3�
14
�0
12
1�
10 °C
7 °C
7 °C
5 °C
Δ
ϕ
1
Δ
ϕ
2
26
�0
3�
14
�0
12
1�
Note
The groundwater station should only be commis-
sioned if there is a sufficient flow rate on the heat
source side.
f
Also observe the flow rate pressure drop diagrams in
chapter "Specification".
f
Check that the hydraulic connection has been carried out
correctly.
5. Appliance handover
f
Make the user familiar with the appliance and hand them
this manual for safekeeping.
6. Cleaning, care and
maintenance
A damp cloth is sufficient for cleaning the casing. Never use
abrasive or corrosive cleaning agents.
6.1 Maintenance
Note
Switch the heat pump off before carrying out main-
tenance work.
The groundwater station heat exchanger must be flushed on
the source side as required. For this, proceed as follows:
f
Remove the upper shell of the insulation from the
groundwater station.
To open the heat exchanger, proceed as follows:
1
3
2
1
3
2
26
�0
3�
14
�0
10
0�
1 Screw cap
2 3-way ball valve with flushing facility
3 Lever
f
Remove screw caps from connectors.
f
Connect flushing unit.
f
Turn 3-way ball valve levers forward 90°.
f
Flush the heat exchanger with clean water. For this, use
15x the volume of the content on the heat source side.
f
Turn 3-way ball valve levers 90° to the right so they are
back in line with the direction of flow.
f
Remove flushing unit.
f
Refit screw caps on connectors.
f
Refit upper shell on groundwater station.
f
Secure the upper shell to the lower shell using the clips
provided.
f
Check that the insulation is diffusion-proof.