
7
Wall mounting
Cylinder installation
26_03_01_0595
26_03_01_0596
26_03_01_0597
C26_03_01_0598
Installation examples
WPKI HK
WPKI HK
WPKI HKM
SBP....E
WPKI RB
Central heating circulation pump Star-E 25/1-5
26_03_01_0594
26_03_01_0595
WPKI HKV
Fit the compact installation together with its insulation to existing pipework.
Tighten fittings by hand.
Mark out.
Then drill holes and secure the lower insulation shell with the screws supplied.
In connection with the
SBP 700 E cylinder, also use the
two pipe bends with dual nipples
supplied.
RL
VL
VL
RL
Po
w
er
c
on
sump
tion
He
ad
Guarantee
For guarantees please refer to the respectivete rms and conditions of
supply for your country.
!
The installation, electrical connection and first operation of this
appliance should be carried out by a qualified
installer.
!
The company does not accept liability for failure of any goods
supplied which have not been installed and operated inaccord-
ance with the manufacturer‘s instructions.
Environment and recycling
Please help us to protect the environment by disposing of the packaging
in accordance with the national regulations for waste processing.
e
n
g
l
Is
H
Summary of Contents for 22 11 39
Page 14: ...14 Notizen...
Page 15: ...15 Notizen...