2
SECTION I.
INTRODUCTION........................................................................3
SECTION II.
SPECIFICATIONS.....................................................................3
SECTION III:
PREPARATION.........................................................................4
A.
Major System Components......................................................................................................4
B. Tools Recommended for Installation.........................................................................................4
C. Determine System Location......................................................................................................4
D. Prepare the Area for Installation...............................................................................................5
E. Prepare the Appliance for Installation.......................................................................................5
SECTION IV.
INSTALLATION STEPS...........................................................5
A. Install the Faucet......................................................................................................................6
1. Make the Faucet Mounting Hole....................................................................................6
2. Mount the Faucet...........................................................................................................7
B. Install the Feed Water Valve and Tubing................................................................................7
C. Prefill and Sanitize the Storage Tank.......................................................................................7
D. Install the Drain Connection.....................................................................................................8
E. Install the RO Membrane.........................................................................................................8
F. Make Initial Tubing Connections..............................................................................................9
G. Install the Purification Assembly and Storage Assembly..........................................................9
H. Make Final Tubing Connections...............................................................................................9
I. Install Ice Maker Hookup (optional)..........................................................................................9
J. Start up the System...................................................................................................................9
K. Flush System of Preservative and Check Operation................................................................9
SECTION V: OPERATION & MAINTENANCE...................................................10
A. Normal Operation....................................................................................................................10
B. Changing Filters......................................................................................................................10
C. For Systems Equipped with Quick Connect Fittings...............................................................12
SECTION VI: TROUBLESHOTTING GUIDE......................................................13
LIMITED WARRANTY.........................................................................................15
TABLE OF CONTENTS: