6017 Series Hot Oil Large Temperature Control Units
Page 13
Electrical Panel and System Components
The pump motor and immersion heater operate on three-phase,
50/60 cycle, nominal voltage with the control circuit at 115 V
single phase. The control circuit voltage is provided by a single
phase machine tool transformer with primary fuse protection and a
grounded secondary. A main power disconnect is included as for
ease of service. The electrical panel is UL listed and complies with
NEC provisions.
All components are IEC rated for long life and reduced
maintenance. The heater elements are branch fused, and protected
from contactor welding by a separate primary voltage contactor.
The pump motor is controlled by a full voltage magnetic reversing
starter, with fused branch circuit overcurrent and thermal overload
protection. Many additional features are available as options.
A NEMA 12 enclosure is standard, with NEMA 4 available as an
option.
Air Purge
Upon initial start-up and mold/process change-out, you’ll need to
purge all air and water from the system. The
6017
unit has
appropriate valving to ensure complete purging. Procedures are
covered in Chapter 3.
!
WARNING
Failure to purge the system of air before heating
may result in serious injury or critical system and
equipment damage.
Make sure you properly purge the system of air
before
starting the heater cycle.
Summary of Contents for 6017 Series
Page 29: ...Page 28 6017 Series Hot Oil Large Temperature Control Units Notes ...
Page 34: ...6017 Series Hot Oil Large Temperature Control Units Page 33 Notes ...
Page 46: ...6017 Series Hot Oil Large Temperature Control Units Page 45 Notes ...
Page 52: ...6017 Series Hot Oil Large Temperature Control Units Page 51 ...
Page 55: ...Page 54 6017 Series Hot Oil Large Temperature Control Units Service Notes ...
Page 56: ...6017 Series Hot Oil Large Temperature Control Units Page 55 Service Notes ...
Page 57: ...Page 56 6017 Series Hot Oil Large Temperature Control Units Service Notes ...