
5
GP6002.B
STERISIL
®
AC SYSTEM
SPECIFICATIONS
Pressure Min/Max
40 PSI/125 PSI
Temp. Min/Max
45°F/ 100°F
Tubing (PEX, PUR)
1/4” OD
Electrical Outlets
3 110V AC, 3 AMP
Fittings
Quick Connects
INSTALLATION DETAILS
UNPACKING
Carefully unpack the contents of the box. The box will include the Sterisil
®
Ac System, Installation Manual,
Warranty Registration Card, large bag, small bag, a white table top faucet and 1/4” tubing
Check to make certain there was no damage during shipment. If damage is evident, contact the shipping
company immediately.
TOOLS
Required tools vary but typically include a sharp razor, knife, or tube cutter, measuring tape, drill, assorted bits
and screws, screwdrivers, wrenches, level, and clean rags.
LOCATION
Generally, the Ac System is installed centrally within the dental office in the equipment room, sterilization center,
hallway, or laboratory. If the hinged mounting bracket is selected, the typical mounting location would be on the
wall near the source water supply. If the sliding bracket is selected, the typical mounting location is under a sink
near the source water supply.
TUBING & CONNECTIONS
Copper piping should not be used anywhere downstream from the system. However, copper piping may be used
from the source water to the System itself. Make sure cuts on the tubing are square and clean to prevent leaks.