Document #OPM/1300, Revision B
CONFIDENTIAL
© 2013 Copyright VTS Medical Systems, LLC
6 of 29
Connecting the Monitor and Turning On/Off
Step 1: Unpacking the carton
Unpack the monitor and other items from the carton. If any of the items are missing (see checklist on
previous page), please call Customer Support at (877) 887-1788.
Step 2: Mounting the monitor
The back of the monitor (see Figure 1) has a hole pattern that complies to the VESA (Video Electronics
Standards Association) mounting standard. The monitor is shipped with eight screws that are screwed into
the back of the monitor. Four screws are 8-32 x 1/2" and four screws are 8-32 x 3/8". Remove all eight
screws and use one set of four screws to attach the monitor to the mount, either in the inside square hole
pattern (75mm) or the outside square hole pattern (100mm). Use the longer four screws for mounts with
thicker mounting plates. The mount is sold separately.
Note to users attaching the HD3 Monitor to an Operating Room Equipment Management System and/or
Equipment Boom:
If the HD3 Monitor is to be mounted on a boom and/or Equipment Management System, the boom
vendor should have wired the appropriate cables through the boom arm.
Step 3: Attaching the monitor to a boom arm and connecting video and power sources
1. Attaching the monitor to a boom arm requires two (2) people. One person supports the monitor and
aligns the mounting holes while a second person physically attaches the monitor to the VESA
mount attached to the boom arm.
2. After the monitor is mounted, remove the cable cover and connect the customer supplied video
cable(s) and power cord to the appropriate port on the back of the monitor. The ports on the
monitor are clearly labeled (see Figure 2).
3. The cable cover should be re-attached using the included screws.
4. The monitor will turn on automatically once it is connected to a power source.