12
www.stenner.com
Stennicator
INSTALLATION
continued
MOUNT PUMP
Select a dry location (to avoid water intrusion and pump damage) above the
solution tank.
To prevent pump damage in the event of a pump tube leak, never mount the pump
vertically with the pump head up.
DO NOT mount pump directly over an open solution tank. Keep tank covered.
Avoid flooded suction or pump mounted lower than the solution container. Draw
solution from the top of the tank. Pump can run dry without damage. If pump is
installed with a flooded suction, a shut-off valve or other device must be provided to
stop flow to pump during service.
To prevent motor damage, verify with a volt meter that the receptacle voltage
corresponds with the pump voltage.
1.
Connect the wires
Simplex Installation
a.
Connect the BLACK & RED wires from the pump to the dry contact input from
the water meter.
b.
Connect the GREEN & WHITE wires from the pump to another device that
accepts a dry contact input as desired or required by the application.
Duplex Installation
a.
Connect BROWN (or ORANGE) & BLUE wires together in Pump #1.
b.
Connect BROWN (or ORANGE) & BLUE wires together in Pump #2.
NOTE: The BROWN (or ORANGE) & BLUE wires are connected to allow for the
pumps to run at half of the standard cycle time. This allows the signal output,
from the first pump, to be provided to a second Stennicator to allow treatment of
up to 5.4 of process flow. DO NOT connect the BROWN (or ORANGE) & BLUE
wires from one pump to another.
c.
Connect GREEN & WHITE wires of Pump #1 to BLACK & RED wires of Pump #2.
d.
Connect BLACK & RED of Pump #1 to the dry contact input from the water meter.
e.
Connect the GREEN & WHITE wires from Pump #2 to another device that
accepts a dry contact input as desired or required by the application.
2.
Set the potentiometer to STBY.
3.
Plug the power supply into a receptacle.
NOTE: The repeater relay is rated for a maximum signal level of 36VDC @ 25mA.