Stellar
®
Slider20-S Owner’s Manual | Page 15
These instructions are intended for correct installation of power beyond on a Salami VDM8
valve bank. If any hydraulic component is integrated after this valve the power beyond
must be installed correctly, or serious damage may incur to the hydraulic system.
1. Remove cover/access plug to reveal
the power beyond access point. Can
also be used as the Return/Tank port.
2. Install 3/8” straight thread pipe plug
(PN 5597) into lower portion of cavity
to activate the power beyond fea-
ture. Use thread sealer (tape sealers
not recommended).
3. The Power Beyond feature is now
activated and will divert oil to alternate
system via the port shown.
Notes:
• The return/tank line must be connected to the top or the side port, labeled “T”.
• Using the return line to run auxillary equipment will directly result in a failure and will not in
any circumstance be covered under warranty.
• A standard Stellar
®
Hooklift will have 6 hydraulic lines attached to the valve. With Power
Beyond activated, they will have 7 hydraulic lines attached to the valve.
Power Beyond VDM8 Valve
Power Beyond
Access Point
Plug
PN 5597
Diverted
Oil Port
Summary of Contents for Slider 20-S
Page 6: ...Page vi Stellar Slider20 S Owner s Manual This page intentionally left blank...
Page 19: ...Stellar Slider20 S Owner s Manual Page 13 Hose Kit PN 54851 Fixed Hook Height Models PN 54851...
Page 30: ...Page 24 Stellar Slider20 S Owner s Manual This page intentionally left blank...
Page 46: ...Subject to Change without Notification 2017 Stellar Industries Inc...