Page 6 | Stellar
®
Slider20-S Owner’s Manual
Note: See torque chart at beginning of chapter:
Step 4: Install tie-downs.
3
4
2
1
2
4
2
3
2
ITEM
PART
DESCRIPTION
QTY.
1
D0143
TIE-DOWN CASTING
10
2
C5902
WASHER 0.63 SAE FLAT YELLOW GR8
40
3
C1025
CAP SCR 0.63-11X2.00 HHGR8 ZY
20
4
24868
NUT 0.63-11 HHGR8 NYLOCK ZY
20
PN 54848
• See NHTSA (National Highway
Truck Saftey Administration) Regu-
lations for acceptable placement.
• Modify the truck frame as neces-
sary so that it ends 2” from the rear
of the hooklift.
Step 3: Install bumper.
2.00
• Before drilling and bolting to the frame, confirm adequate room for cable routing be-
tween in-cab controls and the valve bank. Note: The top of the reservoir should not be
above the truck frame.
Step 6: Install hydraulic reservoir and valve bank.
See brand specific installation instructions.
Step 5: Install tarper tower (If applicable).
Summary of Contents for Slider 20-S
Page 6: ...Page vi Stellar Slider20 S Owner s Manual This page intentionally left blank...
Page 19: ...Stellar Slider20 S Owner s Manual Page 13 Hose Kit PN 54851 Fixed Hook Height Models PN 54851...
Page 30: ...Page 24 Stellar Slider20 S Owner s Manual This page intentionally left blank...
Page 46: ...Subject to Change without Notification 2017 Stellar Industries Inc...