Stellar
®
96-10-24 Shuttle Owner’s Manual | Page 17
• Use PTO brand specific installation instructions.
• For cab controls, see controller assembly drawing for details:
Step 11: Install cab and PTO controls.
In Cab Installation
6
Valve Bank Shown
For Reference
At Valve Installation
CONTROL CABLES
TO VALVE BANK
3
4
2
1
5
9
8
7
9
10
ITEM PART DESCRIPTION
QTY.
1
37470 VALVE CTRL CONSOLE 2LEVER RVC (2-Section)
1
1
38351 VALVE CTRL CONSOLE 3LEVER RVC (3-Section)
1
2
37475 CTRL CNTR LOCK LEFT BEND
1
3
37476 CTRL CNTR LOCK NO BEND
1
4
37474 CTRL CNTR LOCK RIGHT BEND
1
5
25933 BRKT CONTROLLER DECAL
1
6
37469 CABLE CONN. KIT FOR VD8A/VDM8
3
7
37472 CONTROL CABLE 144 IN WESCON
2/3
7
37473 CONTROL CABLE 192 IN WESCON
2/3
7
37471 CONTROL CABLE 96 IN WESCON
2/3
8
20057 CAP SCR 0.31-18X4.00 HHGR5 (2-Section)
2
8
20057 CAP SCR 0.31-18X6.50 HHGR5 (3-Section)
2
9
0343 WASHER 0.31 USS FLAT ZINC
4
10
0342 NUT 0.31-18 HHGR5 NYLOC
2
2 SECTION
3 SECTION
96 INCH
PN 50835
PN 50836
144 INCH
PN 53444
PN 53445
192 INCH
PN 50837
PN 50838
Cable Controls