background image

5

1

1

1a

SCREW M4 X 35

1

1

3

3

2

2

4

4

3

3

3

3

3a

2a

2

2

SCREW M3.5 X 30

Note: Use lubricant on screws that 
fasten into top & bottom rails.

Note: Apply a small bead of 
silicone at joint as indicated prior 
to fully fastening up. Clean off 
excess.

1

2

3

Mark out the positioning of the wall profiles (refer to the Layout Plan on page 5 for measurements). 

Using a soft pencil or masking tape mark out the outside boundary line on the base and up the walls 

with a spirit level. Use the wall channel holes to pre-drill a 2mm lead hole in the lining.

Take the bottom curved horizontal rail (6) and install the two fixed panels (8). NOTE: The screw holes in the 

fixed panel profiles are offset. Check that these align with the screw locations in the curved horizontal rails. 

If they do not line up, change over the fixed panels. Use 3.5x30 frame screws.

Add the top horizontal rail using the M3.5 x 30 screws fasten this frame together.

INSTALLATION

Prior to wall channel fixing

Apply a continuous 7mm bead 

of silicone on back of channel 

plus short bead across tray to 

liner join at base of channel. 

1

Summary of Contents for Georgia Acrylic

Page 1: ...DECEMBER 2018 IMPORTANT 1 When you receive your Georgia Curved Shower package please check for any freight damage 2 If damage has occurred advise your supplier within 8hours 3 Do not install any faul...

Page 2: ...alls to avoid hidden pipes or electrical cables IMPORTANT PREPARATION STEPS 1 Solid fixing must be provided in the walls behind the wall channels 20mm centre off outside of the Acrylic tray 2 Plumbing...

Page 3: ...Top rollers PAR5179 4 5 Wall channels PAR5056 2 11 Handle sets PAR5049 2 6 Top bottom horizontal rails 900 PAR4592 2 12 Magnetic seals STE2885 2 1000 PAR4608 7 Water deflectors requires 2 sets PAR516...

Page 4: ...A This will allow for walls out of plumb protruding or curving inwards up to 4mm Greater variations to plumb will require recalculated reduction of Diagram A MINIMUM AND MAXIMUM TABLE The Minimum and...

Page 5: ...e walls with a spirit level Use the wall channel holes to pre drill a 2mm lead hole in the lining Take the bottom curved horizontal rail 6 and install the two fixed panels 8 NOTE The screw holes in th...

Page 6: ...are tight to fit 1 Apply weight downwards on the top rail to ensure the fixed glass has fully entered the seals 2 Lower the door with adjustment of the top rollers INSTALLATION Fit the frame into the...

Page 7: ...r area if any is present Screens that are sealed on the inside will void warranty Allow 24 hours for silicone to fully dry before use 1b 1c 1a ENSURE THAT THE CHOSEN POSITION IN 1A AVOIDS DRILLING THR...

Page 8: ...8 CONTACT Freephone 0800 002 299 Phone 07 928 9990 Fax 07 928 9999 Email info stein co nz www stein co nz...

Reviews: