background image

Page 4 of 13

939502344 Rev D

®

PREPARING THE WALL STRUCTURE FRAME

AT POWER PASS-THROUGHS:

At locations where there is a power pass-through, 
the shoulder bolt must be secured by using the 
T-nut provided. T-nuts can also secure back-to-back 
brackets at these locations. 

Note the orientation of the T-nut for proper 

engagement with the shoulder bolt.

T-NUT

SHOULDER BOLT

 NUT PLATE

Not in alignment

NEXT TO DOORS:

CAUTION: When glass resides next

to doors, clearance for the threaded 

portion of the shoulder bolt must 

be drilled into the door frame. 

Remove door frame cover before 

drilling holes. Use a 6.4 mm drill.

It is critical to make sure that the 

nut plates for the door are installed 

straight as shown. Align them with 

the post using a diecast mounting 

bracket in the post trough so that 

they will not interfere with the 

mounting brackets when glass is 

installed.

 NUT PLATE

Proper alignment

(be sure to use in 

 this orientation)

Summary of Contents for V.I.A. V2

Page 1: ...e que le verre se brise soudainement en clats tranchants Antes de abrir aseg rese de que la caja est estable e inclinada al menos por 5 grados para evitar que el vidrio se salga de la caja Para abrir...

Page 2: ...ediate Bottom Top Captured Glass Frame for Single Sided Glass Frame B Monolithic Interm ediate Bottom Top Captured Glass for Double Sided Glass Side C M5 x 0 8 x 10mm Button Head Screw with T 20 Driv...

Page 3: ...ets with lock wires install on all verticals and intermediate horizontals NOTE All panels get two brackets with spacer clips at the lower corners in order to maintain the correct 6mm gap below each fr...

Page 4: ...OLT NUT PLATE Not in alignment NEXT TO DOORS CAUTION When glass resides next to doors clearance for the threaded portion of the shoulder bolt must be drilled into the door frame Remove door frame cove...

Page 5: ...steel hammer to secure bracket Make sure each bracket is sitting on the horizontal and is tightly against the post TIP Before installing Side A make sure each opening has two load brackets installed a...

Page 6: ...ve been removed from the cartoning Measure the frame diagonals The diagonals should measure within 1 16 of each other If not square the frame by pushing on the opposite corners until diagonals differ...

Page 7: ...TALLED 1 Locate seal and cut to length so seal runs full length of frame without overhanging The seal is ordered in 2 4 6 8 or 10 foot lengths to correspond to the glass unit size 2 Apply seal to glas...

Page 8: ...and cut to length so seal runs full length of frame without overhanging The seal is ordered in 2 4 6 8 or 10 foot lengths to correspond to the glass unit size 2 Remove indexing trim by slitting along...

Page 9: ...wall opening 1a and swing into wall opening 1b Match the cutouts in the frame to the brackets Shift brackets left right or up down to match side A features 2 Secure side A frames to brackets using the...

Page 10: ...ve and clean if necessary Inspect assembly from side A Make sure all flanges around the inside perimeter of the side frame B or side C are properly tightly aligned to side A If not remove skin and rei...

Page 11: ...to the acoustic seals Slide up on the right side and down on the left side counterclockwise with regard to the face of the frame side Slide left on top latches and right on bottom latches Tip Twist Sk...

Page 12: ...between the frames and hook the back of the frame B side C 4 Push down on the Captured Glass Trim Tool to pry frame B side C loose 5 Start at the bottom of the frame B side C and move up the side of t...

Page 13: ...ck painted glass Side D 3a align the top side brackets with holes then attach to Side D using M5 x 0 8 x 10mm button head screws in ALL hole locations around the entire frame as shown 3b TIP Slatwall...

Reviews: