Page 4 of 13
939502344 Rev D
®
PREPARING THE WALL STRUCTURE FRAME
AT POWER PASS-THROUGHS:
At locations where there is a power pass-through,
the shoulder bolt must be secured by using the
T-nut provided. T-nuts can also secure back-to-back
brackets at these locations.
Note the orientation of the T-nut for proper
engagement with the shoulder bolt.
T-NUT
SHOULDER BOLT
NUT PLATE
Not in alignment
NEXT TO DOORS:
CAUTION: When glass resides next
to doors, clearance for the threaded
portion of the shoulder bolt must
be drilled into the door frame.
Remove door frame cover before
drilling holes. Use a 6.4 mm drill.
It is critical to make sure that the
nut plates for the door are installed
straight as shown. Align them with
the post using a diecast mounting
bracket in the post trough so that
they will not interfere with the
mounting brackets when glass is
installed.
NUT PLATE
Proper alignment
(be sure to use in
this orientation)