Page 30 of 46
939564902 Rev F
®
Modular Power Block Assembly
Assembling & Attaching the Modular Power Blocks
1a
Only required if
'High Capacity'
has been ordered.
Standard Capacity = 1 block
High Capacity = 2 blocks
RECEPTACLE
COVER
1b
POWER BLOCK
NOTE: If receptacles are not
required inside a power
block, make sure to apply a
receptacle cover to ALL open
ports.
2a
2b
2c
2d
STOP: ALL UNITS SHOULD BE BUILT AND GANGED TOGETHER AT THIS POINT.
THE NEXT STEPS ARE TO INSTALL AND ROUTE ALL POWER AND DATA.
A SPECIALIST TRADES PERSON OR QUALIFIED ELECTRICIAN MAY BE
REQUIRED TO INSTALL POWER AND DATA IN YOUR MUNICIPALITY.
NOTE: If receptacles are not
required inside a power block,
make sure to apply a receptacle
cover to ALL open ports.
CENTER BEAM
NOTE: Steps 2b through 2d are also, required
on all Power-In feeds.