![Steelcase Series 5 Assembly Instructions Manual Download Page 23](http://html1.mh-extra.com/html/steelcase/series-5/series-5_assembly-instructions-manual_1369664023.webp)
Page 23 of 46
939564902 Rev F
®
3
Connect the cables to each Lifting Column and connect the
terminal end to the Control Box. Route these cables in the
wire management cableway provided.
For optimal wire management, connect Lifting Columns to the
closest port on the Control Box.
Connecting & Routing Cables
legs or stretcher in any way.
Never
attach wires to the
Series 8 Bench Assembly (cont.)