background image

Page 3 of 3

939501454 Rev A

2.

1c.

BOX HALF ASSEMBLY

BASE

FACEPLATE (AT&T)

FACEPLATE (AMP)

BOX HALF

WINDOW
TO BE INSERTED IN UNUSED 
OPENING AS REQUIRED

BOX HALF
ASSEMBLY 

Cable connect box assembled under 
bottom of desk or worksurface

1c.  

Secure base to back side of box half 

assembly with (2) screws. Locate box half 
assembly to a desired location and use as template 
to drill (2) 5/32” dia. holes 3/4” deep into the bottom 
of worksurface. Attach with (2) screws. Proceed to 
Step 2. 

NOTE:

  For steel worksurfaces, drill holes into hat

section braces.

2.  

Install cable windows as required. (windows 

may be broken in half for a smaller dia. cable 
passage).  Position box half and desired face plate
and secure with required screws.

NOTE: 

 Some prewiring may be required!

SCREW 10 X 7/8”

WORKSURFACE HOLES 
5/32” X 3/4” DEEP 
NOTE:  MARK OR TAPE 
DRILL FOR 3/4” DEPTH

8-32 X 3/8” BLUNT 
NOSE SELF 
TAPPING SCREW

Reviews: