®
Overview of Assembly Process
1) Decide on the table configuration.
2) Assemble 2-piece worksurface or bi-level mechanism (if applicable).
3) Attach legs to worksurface (with worksurface upside-down).
4) Assemble motors, power supply, and gearbox (if applicable).
5) Synchronize legs and add driveshaft(s).
6) Add stretcher(s) and decorative parts.
7) Add driveshaft cover(s) and wire manager(s).
10) Level and clean it up.
11)
PLEASE LEAVE THESE INSTRUCTIONS, AND THE USER GUIDE,
IN AN OBVIOUS PLACE FOR THE END USER AFTER ASSEMBLY.
8) Connect and route all cables, mount switch.
9) Flip table upright and test function.
TABLE OF CONTENTS:
6
7
8
8
9
12
13
13
14
15
15
16 through 19
20
21
22 & 23
24
25
26 & 27
28 through 34
Lets Get Started!.........................................................................................................
Which Legs Go Where?..............................................................................................
Determine Leg Positions on your Table......................................................................
Overhangs and Custom Leg Positions.......................................................................
Mounting Legs to Worksurfaces.................................................................................
Determine Switch Position on your Table...................................................................
90
o
Corner Tables.......................................................................................................
Left-Hand Tables.........................................................................................................
For 90
o
Tables.............................................................................................................
For 120
o
Tables...........................................................................................................
Identify the Primary and Secondary Motors..........................................................................
Installing Motors and Synchronizing Legs...................................................................
Driveshafts and Leg Synchronization..........................................................................
Installing Driveshafts...................................................................................................
Installing Switch & Power Supply................................................................................
Attach Driveshaft Covers and Wire Managers............................................................
Installing Stretchers....................................................................................................
Connect and Route All Cables....................................................................................
Finishing the Table Assembly......................................................................................
Appendix A: 2-Piece Worksurface Assembly..............................................................
Appendix B: Installing a Keyboard Mechanism for Bi-Level Worksurfaces................
PAGE(S):
10
11
Page 6 of 35
004231D Rev T