Note
With a mains grid voltage of 100 V ... 127 V, the inverter can be connected between the L1, L2
and L3 external conductors as follows:
2-phase mains grids
–
N and L are connected between the L1 – L2 external conductors at the inverter side. See
②
and
③
–
One of the two connected external conductors is connected to PE at the inverter side. This
connection can be made within the AC plug or in an external junction box.
Fig. 7 shows an example of an inverter-side connection between L1 and PE:
Above: connection
①
in an AC plug
⑤
Below: Connection
④
in an external junction box
⑥
)
3-phase mains grids
–
N and L are connected between the L1 – L2 or L1 – L3 or L2 – L3 external conductors at the
inverter side.
–
Connect the external conductor on the inverter side to PE: as above.
–
The external conductor voltages are shown in Fig. 8.
1.
Wire the AC plug supplied to match the selected external conductors, as described in the
Appendix under Mounting
⇒
AC plugs. Do not yet close the AC plug.
2.
Connect one of the two connected phases to PE at the inverter side. Make this connection
inside the AC plug or use an external junction box, as shown in Fig. 7.
Fig. 7: Connection of N and PE in the AC plug (above) or junction box (below)
①
Connection cable between N and PE with the connection point inside the AC plug
②
External conductor L1
③
External conductor L2
④
Connection cable between N and PE with the connection point inside the junction box
⑤
Casing of the AC plug
⑥
Junction box
GB
747.431 | Z08 | 2014-01-31
106
Summary of Contents for coolcept StecaGrid 1800
Page 76: ...DE 747 431 Z08 2014 01 31 76...
Page 146: ...GB 747 431 Z08 2014 01 31 146...
Page 162: ...2 Zertifikate Certificates Certificats 747 431 Z08 2013 12 10 162...
Page 163: ...747 431 Z08 2013 12 10 163...
Page 164: ...747431...