Protective Covering 

“Remove Before  

Installation”  

Modular Jack 

Plug 

Knockout for 

Strain Relief 

To Control 

¾" Conduit 

Coupler 

Gasket 

Control Cable 

to Generator 

Installation and Operating Instructions

IMPORTANT: Test Control for operation before installing 
face plate.

6. To install Face Plate, peel back the (2) paper liners on 

Base Plate to expose adhesive surfaces. Attach Face  
 Plate to the control.

7. Clean the face and Base Plate Assembly with a damp 

cloth after installation to remove all dust, dirt, grime, etc.

Figure 1

Model: DSC-425

Figure 2 - Back of Control

02/09

Pub. No. 120-F

- 2 - 

3. Carefully route the other end of the multi-conductor control 

cable from the Steambath Generator to the DSC-425 inside 
the steamroom. Route multi-conductor cable through a ¾" 
conduit to protect the cable from damage and to facilitate 
replacement if necessary.

4.

 

Using the knockout either on top or bottom of the switch box, 
secure cable with a strain relief fitting (provided). It is 
suggested that the strain relief fitting be installed from inside 
the switch box so cable may be adjusted. Allow approximately 
10" - 12" of cable to extend into the box beyond the strain relief 
fitting. Protect control cable by placing it inside the switch box 
during construction, with the protective cap installed over the 
end (see Figure 3).

5.

 

After the walls are finished you are now ready to wire and 
install the DSC-425 Control Digital On/Off Elapsed 
Time/Temp.

CAUTION: 

Electrical Power to the Steambath Generator must be 

OFF before making connections.

a) Locate Telco Jack at female coupler, on back of control. 

Remove the protective covering labeled “Remove Before 
Installation.” Remove protective cap from cable and plug 
into jack. Check that the orientation of the plug properly 
aligns with the jack. A snap will indicate the plug is installed 
correctly (see Figure 2).

b) Mount Base Plate Assembly to the switch box using No. 

6-32 x 2" S/S SCREWS (supplied in the plastic mounting 
hardware bag).

IMPORTANT: DSC-425 Control MUST be mounted inside 

the steamroom. Silicone sealant (supplied) MUST be used 

to form a watertight seal to the wall.

Summary of Contents for DSC-425

Page 1: ...e 1 Remove the cover from the Steambath Generator Insert multi conductor cable with strain relief provided through cabinet knockout and secure the cable to the top of the steambath generator leaving 8 of cable inside the generator Remove the protective covering labeled Remove Before Installation from the Telco Jack found on the Circuit Board Remove protective cap from plug and insert Steamist cabl...

Page 2: ...rovided It is suggested that the strain relief fitting be installed from inside the switch box so cable may be adjusted Allow approximately 10 12 of cable to extend into the box beyond the strain relief fitting Protect control cable by placing it inside the switch box during construction with the protective cap installed over the end see Figure 3 5 After the walls are finished you are now ready to...

Page 3: ...er Plate This will aid in preventing movement of this plate see Figure 5 6 Place the Cover Plate over the Center Hub This is accomplished by first hooking the top and then snapping the bottom into place 7 Adjust the Back Plate and Cover Plate to line up squarely and clean excess silicone with rubbing alcohol Installation and Operating Instructions Figure 3 Model DSC 425 02 09 Pub No 120 F 3 IMPORT...

Page 4: ...anged again The temperature range is 50 to 130 F 10 to 55 C The timer however has both temporary and permanent memory Any adjustments made to the timer while the system is active will be stored in temporary memory for that cycle only Any adjustments made to the timer while the system is off are stored in permanent memory The temporary memory allows you to make adjustments to the time in accordance...