19
9 Preparing the Stud Welding Gun
©Walter Stauffenberg GmbH & Co. KG
All rights reserved – Reprinting, in whole or in part, only with the approval of the manufacturer
9.1
Mounting the chuck (SR) /
Setting the Insertion Depth (Protrusion)
chuck
Use the Allen key to remove the three screws of the
positioning tube and remove the tube
Remove the hexagon nut with the socket spanner and
remove the stud holder
Place a stud into new stud holder
Insert the stud holder loosely into the front opening
Loosely place the positioning tube
Adjust distance X by inserting the stud holder
Carefully remove the positioning tube
Tighten the hexagon nut with the socket spanner
(Ensure not to change the position of the stud holder!)
Place the positioning tube and tighten the three screws lightly
5
x
A
6
9
5
Allocation of adapter to fixing type of clamp bodies
Size
STANDARD
1
AGS-1
1a
AGS-1A
2
AGS-2
3
AGS-3
4
AGS-4
5
AGS-5
6
AGS-6
7
AGS-7
8
AGS-8
* Use of the AGS only in connection with DIT-SR6-SWG-WG25R
Summary of Contents for SWG-WG
Page 1: ...Local Solutions For Individual Customers Worldwide Operating Manual SWG WG SWG WG...
Page 34: ......
Page 35: ......