12
www.starwincom.com
Tel: +8629-88664381, E-mail: [email protected]
5.2 Terminal Initialization
1.
Connect the Power cable to the Power Source. Upon connection, the display will show the Logo, as shown in
Figure 5-4.
Figure 5-4 LOGO
DANGER
The standard requirements to Power Source are 100-240VAC 50/60Hz. (Or 24V + 5% DC, according to
configuration for selection)
2.
When the Terminal is powered on, the Terminal will display with indicator and abbreviated text. The display
icon description of system initialization is shown in Table 5-1. The first three items are main power supply
detection, general power supply, LNB power supply and BUC power supply. As shown in Figure 5-7, the
power quantity is displayed; when the self-test passes, it will be displayed as shown in Figure 5-8.
Table 5-1 System Initialization Icon Description
Indication
Indicator Flashes
General Power
Supply is in process
of detection
LNB Power Supply
is in process of
detection
BUC Power Supply
is in process of
detection
GNSS signal is in
process of detection
Attitude is in process
of detection
Indication
Indicator Lights
Continuously
General Power
Supply is detected
LNB Power Supply
is detected
BUC Power Supply
is detected
GNSS signal is
acquired
Attitude is detected
Figure 5-5 Battery Indicator