E-SHOP dOwnlOad
shop.haberkorn.com
15/1
GB
C
C
I
I
R
R
C
C
U
U
I
I
T
T
D
D
I
I
A
A
G
G
R
R
A
A
M
M
M
M
P
P
E
E
R
R
I
I
O
O
D
D
I
I
C
C
I
I
N
N
S
S
P
P
E
E
C
C
T
T
I
I
O
O
N
N
A
A
N
N
D
D
M
M
A
A
I
I
N
N
T
T
E
E
N
N
A
A
N
N
C
C
E
E
Attention! Always make sure that the machine is not connected to the main
electricity network before any mechanism maintenance is carried out.
9
Hereinafter, per cycle means that the operator operates the load up and down
for one time. Periodic check means that a part needs to be inspected after the
hoist working per 100 cycles.
9
Periodically make sure the limit switches function properly. The limited system
should be tested as follows:
9
When the hoist is carrying out hoisting operation (without load), move the
spacing collar (3) towards the rising direction, the motor of the machine must
stops running.
9
When the hoist is carrying out lowering operation, move the down limit pole,
the motor must stop running.
9
Periodically check the power cords and control cords.
9
Lubricate the steel cable and the pulley after per 200 cycles.
9
Confirm if the steel cable is in good operating mode after per 30 cycles. If
there any damages on the steel cable (see Fig. 3), replace the steel cable
immediately in accordance with the requirements in the technical data table.
9
Inspect if the screws securing the bracket and the pulley are well tightened
after per 1000 cycles.
9
Check the hook and the pulley after per 1000 cycles to ensure that they are in
good operating modes.
9
Before using the electric rope hoist every time, inspect the emergency Stop
switch and is button panel to ensure they are in good operating modes.
9
Inspect the braking system after per 100 cycles. If there are abnormal noises
in the motor of the hoist is unable to hold the rated load, the braking system
must be overhauled.
9
Replace damaged and worn parts, and keep necessary maintenance record.
Contact an authorized service centre for extraordinary maintenance.