Stanley GD50 User Manual Download Page 10

10 ► GD50 

User Manual

PREPARATION PROCEDURES

PREPARATION FOR INITIAL USE

Each  unit  as  shipped  has  no  special  unpacking  or 

assembly  requirements  prior  to  usage.  Inspection  to 

assure the unit was not damaged in shipping and does 

not contain packing debris is all that is required.

CHECK HYDRAULIC POWER SOURCE

1. 

Using a calibrated flow meter and pressure gauge, 

check that the hydraulic power source develops a 

flow of 7–9 gpm/26–34 lpm for HTMA Type II tools/

EHTMA category D at 2000 psi/105–140 bar.

2. 

Make certain the hydraulic power source is equipped 

with a relief valve set to open at 2100–2250 psi/145–

155 bar minimum.

3.  Check that the hydraulic circuit matches the tool for 

open-center (OC) operation.

CHECK TOOL

1. 

Make  sure  the  tool  contains  the  correct  anvil  for 

the  rod  size  to  be  driven.  Use  the  5/8  inch  anvil 

(standard in the model GD50132RF Rod Driver) for 

5/8 inch diameter rod. Use the 1 inch anvil (standard 

in the model GD50133RF Rod Driver) for 3/4 inch to 

1 inch diameter rod. Failure to use the correct anvil 

with the appropriate rod size can result in damage to 

the tool or personal injury.

2. 

There should be no signs of leaks.

3.  The  tool  should  be  clean,  with  all  fittings  and 

fasteners tight.

CHECK TRIGGER MECHANISM

1. 

Check that the trigger operates smoothly and is free 

to travel between the 

ON

 and 

OFF

 positions.

CONNECT HOSES

1. 

Wipe all hose couplers with a clean, lint-free cloth 

before making connections.

2. 

Connect the hoses from the hydraulic power source 

to the hose couplers on the tool. Connect the return 

hose first and disconnect it last to minimize or avoid 

trapped pressure within the rod driver.

3.  Observe flow indicators stamped on hose couplers 

to be sure that oil will flow in the proper direction. 

The female coupler is the inlet coupler.

Note:  The  pressure  increase  in  uncoupled  hoses 

left in the sun may result in making them difficult to 

connect.  When  possible,  connect  the  free  ends  of 

operating hoses together.

OPERATING PROCEDURES

1.  Observe all safety precautions.
2.  Move the hydraulic circuit control valve to the 

ON

 

position.

3.  Place the anvil of the rod driver over the rod to be 

driven.

4. 

Ensure  adequate  down  pressure  is  applied  to  the 

rod driver before starting the rod driver. To start the 

rod driver, press the button on the control valve to 

the 

ON

  position. Adequate  down  pressure  is  very 

important. When you wish to stop the tool, press the 

button on the control valve to the 

OFF

 position.

INLINE CONTROL VALVE OPERATION

The 38632 Inline Control Valve is designed to provide 

the ON/OFF functions for a hydraulic tool connected to 

either an OPEN CENTER (OC) hydraulic system or an 

CLOSED  CENTER  (CC)  hydraulic  system.  The  valve 

is to be used with tools which do not have an ON/OFF 

trigger control. The 38632 Control Valve can be used on 

hydraulic systems producing up to 10 gpm/38 lpm with 

a maximum relief valve setting of 2500 psi/172 bar. The 

valve ports are -8 SAE (3/4-16 thread) O-ring ports.

SETTING FOR OPEN CENTER (OC) OR 

CLOSED CENTER (CC)

Set the valve to OC or CC before connecting it to the 

hydraulic system. To set the valve for open center 

operation, use a straight blade screw driver to turn the 

selector  screw  counter  clockwise  until  it  stops.  To  set 

the valve for closed center operation, turn the selector 

screw clockwise until it stops.

Be sure you know if you have an OPEN CENTER 

(OC) OR CLOSED CENTER (CC) hydraulic system, 

DO NOT attempt to install or operate the 38632 

Valve until you do. Incorrect installation or operation 

of the valve can result in seal failures in the tool, 

cause excessive heat in the hydraulic system, 

and may damage the tool and hydraulic system. 

Understand which type of hydraulic system you are 

using before installing or operating this valve.

OPERATION

Summary of Contents for GD50

Page 1: ...2014 Stanley Black Decker Inc New Britain CT 06053 U S A 39234 8 2018 Ver 11 USER MANUAL Safety Operation and Maintenance GD50 HYDRAULIC GROUND ROD DRIVER...

Page 2: ......

Page 3: ...Note The warranty validation record must be submitted to validate the warranty SERIOUS INJURY OR DEATH COULD RESULT FROM THE IMPROPER REPAIR OR SERVICE OF THIS TOOL REPAIRS AND OR SERVICE TO THIS TOO...

Page 4: ...messages that follow this symbol to avoid possible injury or death This safety alert and signal word indicates an imminently hazardous situation which if not avoided will result in death or serious in...

Page 5: ...energizing the hydraulic power source Be sure all hose connections are tight Do not operate the tool at oil temperatures above 140 F 60 C High temperatures can cause operator discomfort Do not operate...

Page 6: ...RING SYSTEM SYSTEM PRESSURE HOSE MUST ALWAYS BE CON NECTED TO TOOL IN PORT SYSTEM RETURN HOSE MUST ALWAYS BE CONNECTED TO TOOL OUT PORT REVERSING CONNECTIONS MAY CAUSE REVERSE TOOL OPERATION WHICH CAN...

Page 7: ...TH TO REMOVE DIRT AND MOISTURE AND TEST HOSE FOR MAXIMUMALLOWABLE CURRENT LEAKAGE INACCORDANCE WITH SAFETY DEPARTMENT INSTRUCTIONS SEE OTHER SIDE SIDE 2 D O N O T R E M O V E T H I S T A G 3 DO NOT EX...

Page 8: ...175 1 25 4 Return 2500 175 13 16 49 60 up to 25 up to 8 5 8 16 Pressure 2500 175 3 4 19 Return 2500 175 13 16 49 60 26 100 8 30 3 4 19 Pressure 2500 175 1 25 4 Return 2500 175 Figure 1 Typical Hose C...

Page 9: ...operator discomfort at the tool Filter minimum full flow filtration 25 microns 25 microns 25 microns 25 microns Sized for flow of at least For cold temp startup and maximum dirt holding capacity 30 GP...

Page 10: ...coupler Note The pressure increase in uncoupled hoses left in the sun may result in making them difficult to connect When possible connect the free ends of operating hoses together OPERATING PROCEDUR...

Page 11: ...he hydraulic system Place the tool to be operated in its operating position Push the valve spool ON to begin operating the tool Push the valve spool OFF to stop operating the tool Turn the hydraulic s...

Page 12: ...tester gauge reads 600 700 psi 41 48 bar close the valve on the charging assembly hose and remove the charging assembly 7 Turn the gauge end of the tester fully counterclockwise to retract the plunge...

Page 13: ...se damage to internal seals Always replace hoses couplings and other parts with replacement parts recommended by STANLEY Supply hoses must have a minimum working pressure rating of 2500 psi 172 bar Do...

Page 14: ...urn line hoses reversed at ports Be sure hoses are connected to their proper ports Mechanical failure of piston or automatic valve Have inspected and repaired by an authorized dealer Rod driver does n...

Page 15: ...64 8 cm Overall Width 10 inches 25 4 cm Maximum Fluid Temperature 140 F 60 C SERVICE TOOLS DESCRIPTION PART NUMBER O ring Tool Kit General Service of Seals 04337 Split Rings Used with 04910 04908 Flo...

Page 16: ...50 User Manual GD50 PARTS ILLUSTRATION OLD INLINE VALVE NEW INLINE VALVE NOTE IF YOUR INLINE VALVE DOES NOT CONTAIN THIS PART SEAL CAP ORDER INDIVIDUAL PARTS FROM OLD INLINE VALVE 56 INLINE VALVE ASSE...

Page 17: ...04954 1 PISTON 38 02022 1 O RING 39 04387 1 WIPER RING 40 04780 1 BACK UP WASHER 41 04386 1 CUP SEAL 42 12139 4 SIDE ROD 43 43527 1 ADAPTOR BLOCK ITEM PART NO QTY DESCRIPTION 44 72592 1 ADAPTOR BLOCK...

Page 18: ......

Page 19: ......

Page 20: ...STANLEY Infrastructure 6430 SE Lake Road Portland Oregon 97222 USA 503 659 5660 Fax 503 652 1780 www stanleyinfrastructure com...

Reviews: