5
V.
INSTRUCTION MANUAL
PS. Please turn the Regulator to “the lowest speed” position before turning on the machine.
1. The mechanical construction of this machine is illustrated as shown on the Parts List.
2. The adjusting screws, above and under the Band Guides, can be adjusted as long as.
3. The worktable can be titled.
4. This manual has been prepared for the operator who operates, and the maintenance of
the Vertical Saw. The purpose is to promote safety through the use of accepted
operation procedure.
The following instructions in operations and maintenance shall be observed in order to
obtain the maximum efficiency of the unit.
The procedure is shown as follows:
A. Power
B. Sawing material selection
C. Blade selection
D. Blade cutting device
E. Welder
F. Grinder
G. Blade installation
H. Guide rob adjustment
I. Inverter speed selection
J. Air pump
K. Angle cutting
L. Safety and maintenance
M. Inverter parameters
ACTION TAKEN
A. Power
1. First, before operating the machine, be sure to check the voltage which is in accordance
with the power supply system.
Summary of Contents for 388201
Page 1: ...VERTICAL BAND SAW MODEL VS 400 VS 500 VS 585 Operating Manual ...
Page 14: ...14 ...
Page 15: ...15 ...
Page 16: ...16 ...
Page 22: ...22 VIII ELECTRICAL DRAWING FOR VS 400 VS 500 and VS 585 ...
Page 23: ...23 ...
Page 24: ...24 ...