3
I.INTRODUCTION
The “Operating instructions” are an integral part of the machine and should be
consulted before, during and after the start up of the machine and whenever else
required. The content of these instructions should always be carefully observed.
The observance of the above is the only way to achieve the two fundamental aims of this
manual:
●
Optimization of machine performance
●
Prevent damage to the machine and injury to the operator
CAUTION: BEFORE INSTALLING THE MACHINE, READ
THE OPERATING INSTRUCTIONS CAREFULLY
II.INFORMATION ABOUT MAINTENANCE ASSISTANCE
2.1 GUARANTEE
● The products are guaranteed against material and manufacturing defects for a period of
12 months from the date of delivery.
● The buyer is only entitled to the replacement of parts which are acknowledged as
faulty: carriage and packing are at the buyer’s. In the event of the above, the following
information should be supplied:
1. Date and number of purchasing document
2. Machine model
3. Serial number
4. Code of any relevant drawings
● Requests for compensation for the inactivity of the machine will not be accepted.
● The guarantee does not cover uses which are not in line with these operating
instructions which are an integral part of the machine. Nor is maintenance covered if
the instructions supplied are not observed.
● The guarantee will not cover machines which have undergone unauthorized
modifications.
● Modification or tampering with the safety devices is strictly forbidden.
Summary of Contents for 388201
Page 1: ...VERTICAL BAND SAW MODEL VS 400 VS 500 VS 585 Operating Manual ...
Page 14: ...14 ...
Page 15: ...15 ...
Page 16: ...16 ...
Page 22: ...22 VIII ELECTRICAL DRAWING FOR VS 400 VS 500 and VS 585 ...
Page 23: ...23 ...
Page 24: ...24 ...