background image

Assembly Manual

7

Assembly

Step 3:  Removing Console/Upper Mast

Tools

•  Box knife

3-1 

Using the box knife, open the top of the box holding 

the Console/Upper mast weldment

 (see Figure 4).

3-2  

Bend the box center flap inward. Carefully lift the 

console/upper mast weldment out of the box and 

place to the side (see Figure 5). 

Figure 4

Figure 5

Summary of Contents for SC916 StairClimber

Page 1: ...Nautilus Bowflex Schwinn Fitness StairMaster Universal Nautilus Institute Assembly Manual SC916 StairClimber PN 001 7201 040208A...

Page 2: ...x 109 cm x 173cm Unit Weight 150 lbs 68 kg Shipping Package Weight 178 lbs 81 kg Workout Area 50 W x 81 L 127 cm x 205 74 cm Power Requirements 120vac 50 60 Hz 1 5 Amp Max user weight 300lbs 136 kg Mo...

Page 3: ...r chest become short of breath or feel faint Contact your doctor before using the machine again Examine this machine for loose parts or signs of wear Pay special attention to the pedals Contact Nautil...

Page 4: ...er front of the left side cover see Figure 1 Label 2 General exercise warning label Location Affixed to the mast below the console see Figure 2 Safety Warning Labels Caution Label Serial number Figure...

Page 5: ...sic assembly tips when putting together your machine 1 Collect all the pieces needed for each step before assembling 2 Read through and understand the instructions before assembly 3 Use a combination...

Page 6: ...from the body to avoid cutting yourself 1 2 Use claw hammer to remove staples from the bottom of the carton 1 3 Carefully lift the outer carton up and over the SC916 see Figure 2 Step 2 Removing Hand...

Page 7: ...ls Box knife 3 1 Using the box knife open the top of the box holding the Console Upper mast weldment see Figure 4 3 2 Bend the box center flap inward Carefully lift the console upper mast weldment out...

Page 8: ...allet and on to the floor see Figure 6 Step 5 Removing Covers Tools Phillips screwdriver 5 1 Remove the 6 Phillips screws from the Mid cover and place to the side see Figure 7 5 2 Remove the 6 Phillip...

Page 9: ...tep 3 see Figures 9 and 10 6 2 Remove CHR and J6 Polar HR cables from the back of the console connected to the PC board see Figure 11 NOTE After removing the 2 cables from the PC board secure the cabl...

Page 10: ...Figure 12 7 2 Secure the Main cable with the CHR and Polar cables to the console plate Step 8 Attaching Masts Upper and Lower Tools 9 16 or 14 mm wrench or socket 8 1 Secure the upper mast weldment to...

Page 11: ...per end into the lower part of the handlebar weldment and line up the screw holes see Figure 16 9 4 Loosely attach the supplied Hex screw to the upper handrail handlebar weldment junction using the 5...

Page 12: ...to J6 Polar HR connector on the PC board see Figure 20 11 3 Connect the Main cable from the mast to the 20 pin connector on the PC board see Figures 20 11 3 Secure the console with the 4 Phillips scre...

Page 13: ...rdware 13 2 Read all warnings on machine Refer to the Owner s Manual for Operating Instructions Maintenance Instructions Failure to visually check and test assembly before use can cause damage to the...

Page 14: ...a list of distributors in your area please call or fax one of the following numbers INTERNATIONAL CUSTOMER SERVICE Nautilus International S A Rue Jean Prouv 1762 Givisiez Switzerland Tel 41 26 460 77...

Page 15: ...lex Bowflex Logo StairMaster StairMaster Logo Universal and Nautilus Institute are either registered trademarks or trademarks of Nautilus Inc Schwinn is a registered trademark All other trademarks are...

Reviews: