1
General information
8
01.2019
ba
-o
.1
.8
.0
-en
-3
.1
1.10
Installation, commissioning, maintenance and repairs
•
Installation, commissioning, maintenance and repairs may be carried out by qualified
persons only.
•
We recommend having installation carried out by qualified personnel engaged by the
manufacturer.
•
Do not carry out any alterations or modifications.
•
Additional fitments must be approved by the manufacturer.
(During welding work, electrode and ground must be in contact with the same com-
ponent!)
•
Use only original spare parts for repairs.
•
Dismantled guards must be screwed down again and locked.
If the chain hoist is constantly operated out of doors and exposed to the elements without
protection, we recommend fitting a canopy or at least "parking" the hoist under a roof.
1.11
After-sales service
You have purchased a high-quality product. A contracted after sales service will give you
advice on its maintenance and correct use.
In order to maintain the safety and constant availability of the product, we recommend
concluding a maintenance agreement.
1.12
Periodic tests
Hoists and cranes must be inspected by a qualified person (see chapter 1.6) at least once
a year, more frequently if so specified by national regulations.
The results of the test must be recorded and filed in the test logbook.
The remaining service life of the hoist acc. to FEM 9.755 must also be established during
this inspection.
The periodic tests must be adapted to the hoist’s use. Intensive use or adverse
environ-
mental conditions entail shorter maintenance intervals.
All tests must always be initiated by the user! (see chap.1.6)
Summary of Contents for ST05
Page 1: ...Chain Hoists Original instructions ...
Page 2: ......