
5
Commissioning and testing
20
10.20133
B
A
_S
LE
22
_E
N
.D
O
C
X
5.3
Documenting alterations of cut-off point
DANGER
After testing the new cut-off point, it must be documented, confirmed and signed in the lid
of the case, in the following table and in the crane logbook.
Any undocumented alteration of the cut-off point leads to an immediate loss of warranty
and is grossly negligent.
Cut-off point
Reason for alteration
Signature of
user
Signature of
service engi-
neer