![Stahl is pac 9191/20-00-50 Operating Instructions Manual Download Page 16](http://html1.mh-extra.com/html/stahl/is-pac-9191-20-00-50/is-pac-9191-20-00-50_operating-instructions-manual_1357694016.webp)
Operating Instructions
english
16
Termination module 9191/20-00-50
• Read through the following installation conditions and assembly instructions carefully and
follow them precisely.
6.1.1 Operating position
The pac-Bus and the supply module can be installed in any position.
6.1.2 Mounting
6.1.3 Dismounting
6.2 Installation
Operation under difficult conditions, in particular on ships, requires additional
measures to be taken for correct installation, depending on the operating
location. Further information and instructions on this can be obtained from your
regional sales contact upon request.
6.2.1 Electrical connections / schematic diagram
See device labelling.
7 Parameterization and Commissioning
Before commissioning, carry out the following checks:
• Mounting and installation of the device according to regulations.
• Correct, secure connection of the cables.
• No damage to the device or the cables.
• The screws are securely fastened to the terminals.
Correct tightening torque: 0.5 to 0.6 Nm.
• Do not commission the device until it has been successfully tested.
Summary of Contents for is pac 9191/20-00-50
Page 20: ...Operating Instructions english 20 Termination module 9191 20 00 50 14 2 Dimensional drawing...
Page 21: ...21 EU Konformit tserkl rung EU Declaration of Conformity...
Page 22: ...22 Certification drawing FM...
Page 23: ......
Page 24: ...R STAHL Schaltger te GmbH Am Bahnhof 30 74638 Waldenburg Germany r stahl com...