Installation Switch
Series 8040/11-V30
8
Parameterization and Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Inspect the enclosure for damage.
• Remove any foreign bodies.
• If necessary, clean the connection chamber.
• Check whether the cables have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check if all conductors have been clamped firmly.
• Check whether all covers and partitions for live components have been installed and
fastened.
• Use stopping plugs that have an EC-type examination certificate or
an IECEx Certificate of Conformity to seal unused cable entries and drilled holes.
• Check the tightening torques.
9
Operation
The installation switch is operated via an axis and actuated by the contacts.
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.