Istruzioni Instructions Anleitungen instrucciones Инструкции Instrukcja
Anchoring the foundation plate
Before commencing to anchor the
foundation plate to the ground, first
prepare one or two sheaths for passing
the cables through (Fig.1)
After having verified the optimum
conditions for placing the plate, bend the
fish-tail clamps vertically and concrete
the plate in (Fig.1).
Fig.1
Installing the gear motor
Unscrew the two side screws to remove the top (Fig.2).
Position Hercules on the foundation plate, taking care to centre
the antiskid device (Fig.3).
Fix the gear motor to the foundation plate with the screws but
before tightening them completely, adjust the distance
between Hercules and the gate.
Take the first sector of the rack and position it on top of the
gear, check there is a clearance of at least 1 mm between the
gear and rack; fix it to the gate with the screws.
Check the correct position by moving the gate by hand (Fig.4).
Fig.2
Fig.3
Fig. 4
1mm
9
Summary of Contents for ACHILLES-1200 230V
Page 2: ...Istruzioni Instructions Anleitungen instrucciones Instrukcja ARGO ACHILLES ATLAS ASM PEGASUS 2...
Page 25: ...Istruzioni Instructions Anleitungen instrucciones Instrukcja 1 1 1 2 3 1 1 2 3 4 1mm 25...
Page 26: ...Istruzioni Instructions Anleitungen instrucciones Instrukcja 5 5 6 1 2 3 1 3 6 26...