6 . Commissioning and Maintenance
6 .1 Function check
The function of the HOLDX process guard locking has to be checked. Ensure the following
before you start:
• The process guard locking and the corresponding anchor plate are firmly seated.
• The supply line is firmly seated and not damaged.
• The system is free of all contamination.
Note
Damaged or defective devices must not be put into operation!
6 .2 Maintenance
The magnet coils are maintenance-free. If during the operation faults or failures of unknown
origin occur, replace the magnetic guard lockings. Damaged or defective magnet coils or plug
connectors must not be repaired and have to be replaced. If the magnet coils are exposed
to excessive loads, additional safety measures may be necessary.
7 . Disassembly and Disposal
7 .1 Removal
Disassembly of the process guard locking HOLDX L1 should only be performed in a de-en-
ergized state.
7 .2 Disposal
The process guard locking HOLDX L1 must be disposed of properly in accordance with
national and local regulations.
8 . Appendix
8 .1 Electrical connection
Note:
The illustrated examples are only suggestions. The user has the responsibility to
design the overall system in compliance with applicable rules and regulations.
Connection example 1: (individual wiring)
HOLDX L1
SAFIX S1
Connection example 2: Y-plug XCONN M12-Y
HOLDX L1
SAFIX S1
XCONN M12-Y