Page 8
ASSEMBLY INSTRUCTIONS
(CONTINUED)
6.
Place the silicone pump inlet cover over the intake port of the immersion pump.
7.
If your cooler is dedicated to the FTSs
2
system, drill holes for the chilled water tubes and place the
tubes through the holes with the pump located inside the cooler.
Pump Inlet Cover
Pro Grade Submersible Pump
Hose Clamp
Vinyl Tubing