SRNE Solar Co., Ltd.
4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China
T: +86 0755-26458295
F: +86 0755-27325578
Page 18 of 48
File version: V1.0
5 System Installation
5.1 Inspections before Installation
Inspection of outer package
Before opening outer package of the energy storage, check if there is any visible damage on the outer
package, such as holes, cracks or other signs of possible internal damage, and check the type of energy storage.
If there is any abnormality on the package or model of the energy storage is inconsistent, do not open it and
contact us as soon as possible.
Inspection of deliverables
After opening outer package of the energy storage, check if the deliverable is complete and whether there is
any visible external damage. If any items are missing or damaged, please contact us.
NO.
Picture
Item
Quantity
Specification
Source
1
Inverter
1
3.5kW/24V,110V/220V
Inverter
Package
2
Battery
N
5.12kWh/25.6V
Battery
Package
3
Base
1
680*184*80mm
Inverter
Package
4
Mounting Frame
2*N
80*44mm
Battery
Package