background image

                                                                                                      

 

Copyright By SRC 
Design and Specification are subjected to change                                                                                                                                                                                     

 

 

 

Page 4 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step 3:  

Slide-in the Top Plate (1), as shown 
and orient the mounting holes in-line 
with the 4 Projecting screws. 

Step 4:  

Secure the threads on the screw using 
M6 Nut (5), as shown. 

“As is Mounted condition “after Insertion of 
the M6 Screws from the Bottom side, and 
flushing the countersink contours of the 
screws and the Bottom plate. 

Reviews: