background image

Installation Manual

iPAMM 

Version 2.0

Warning: Do not connect the iPAMM to any power source until the 
unit is completely installed.

10. If the Magnetic Blanking Sheet 

is supplied, place over the exposed

venting immediately behind the iPamm 

module.

11. Ensure all vents are covered by the 

Magnetic Blanking Sheet as shown and 

the sheet is up against the end of the 

iPamm. 

If this optional Magnetic Blanking Sheet is 

not supplied please contact SRA Solutions 

to discuss as sheet will increase iPAMM 

performance.

 

11

 

Check placement

10

 

Place the sheet

iPAMM installation is now complete 

iPAMM 

Versi

iPAMM installation is now complete 

v2.0

Summary of Contents for iPAMM

Page 1: ...been engineered and manufactured entirely in Australia This document is subject to change without notice We recommend obtaining the latest version from the Server Racks Australia Website www srasolutions com au IIf you have difficultly installing an iPAMM Unit please contact SRA for advice e enquiry srasolutions com au p 61 2 6298 1855 For iPAMM Version 2 0 Please Note The term iPAMM is used through...

Page 2: ... 2 x Contact Washers over the fourth stud from the bottom position 2 8 Place the iPAMM Grille onto the front of the unit with the return towards the top Place the pinch weld side hard up against bottom of the IPAMM and frame bottom then pivot the grille such that the top return slides underneath the top cover It may require some downward pressure to locate the lip under the top cover 9 Secure the ...

Page 3: ...iately behind the iPamm module 11 Ensure all vents are covered by the Magnetic Blanking Sheet as shown and the sheet is up against the end of the iPamm If this optional Magnetic Blanking Sheet is not supplied please contact SRA Solutions to discuss as sheet will increase iPAMM performance 11 Check placement 10 Place the sheet iPAMM installation is now complete iPAMM Versi iPAMM installation is now...

Page 4: ...y aligning the iPAMM Circuit Board Guard holes and supporting both the guard and handle Fasten using 2 x M4x12 Button Head Socket Screws 10 Slide on cover your iPAMM can now be installed as a top mount unit 5 Rotate the PCB 7 Secure display plate 8 Fasten PCB guard 9 Fasten the handle 10 Slide on cover 1 Remove the iPAMM from the server rack and place on a stable surface sliding cover facing up Sl...

Reviews: