SPYKER 30 Operation Manual Service Manual Parts List Download Page 4

15.

Check for proper alignment. Tighten ALL nuts

and bolts at this time.

16.

Attach lever control
assembly (34) to the
right hand side of 
T-handle (30) using 
(2) 3/8” x (1

1

/

8

”) bolt

and nut. 

Tighten securely.

17.

Rate gate adjustment
procedure

New Linkage Adjustment Procedure

1. Set regulator dial to 1.

2. Set lever completely to off position.

3. Attach cable clamp to ground prop

with 1

1

/

4

” bolt and nut and finger 

tighten.

4. Route cable through clamp, then

through swivel and then tighten the
cable clamp bolt just enough to allow
the cable to slide back and forth easily.

5. Adjust sheath on cable so there is a

1/8" inch of control wire that is visible
between the sheath and the edge of
the rate gate linkage.

6

6. Tighten the cable clamp bolt to

secure the sheath.

7. Tighten the screw on the swivel

to anchor the wire, making sure
that the rate gate linkage is
pushed up against the dial.

8. Trim excess wire behind swivel

connector when finished
(if necessary).

Read Before Using

Read Before Using

Spreader Assembly

11.

Connect ground prop
to center section
using (1) 1

1

/

4

” bolt

and nut. The flattened
side of the ground
prop should be on the
opposite side as the
T-handle labels.

12.

Now use the 1

1

/

2

” bolt

and install support
braces (27) loosely to
handle assembly 

14.

Secure the braces
(27) loosely to the
frame with a 1

1

/

2

bolt and nut.

Braces must be on
the inside of the
frame.

13.

Position the spreader
as shown. Join the
handle loosely to the
crossbar, using the 
1

1

/

2

” bolt.

5

Summary of Contents for 30

Page 1: ...ers available for all round hopper spreaders Adds 20 lbs to capacity Shipped Set Up Saves time and labor ENSURES proper assembly except 64 Stainless steel frames ensure longer spreader life easier maintenance and present a quality image High grade plastic non corroding wheels with nylon bearings no lubrication required ENSURES trouble free maintenance FEATURES BENEFITS MODEL 298 Mulch Spreader 70 ...

Page 2: ...toward the ground when spreader is assembled 2 Did You Know Assembly Instructions Tools you will need Flat head Screwdriver 7 16 3 8 wrenches Hammer Parts you will use Hopper assembly Axle gears spinner assembly Drive pin for installation in axle to engage drive wheel Frame 2 support braces 2 wheels 2 axle bearings 2 wheel retainer caps 2 handle grips Rotary agitator for use only if required and n...

Page 3: ...e lubricated with water only model 34 only Note Center sections is being obsoleted Your spreader may not contain one Troubleshooting Model 34 tire shown Spreader Assembly 4 After installing axle in frame Install 1 drive pin 18 into axle for drive wheel 5 Install the wheels Be sure slotted hub side is next to the frame The drive pin will engage the drive wheel Note model 54 has a black plastic hopp...

Page 4: ...at is visible between the sheath and the edge of the rate gate linkage 6 6 Tighten the cable clamp bolt to secure the sheath 7 Tighten the screw on the swivel to anchor the wire making sure that the rate gate linkage is pushed up against the dial 8 Trim excess wire behind swivel connector when finished if necessary Read Before Using Read Before Using Spreader Assembly 11 Connect ground prop to cen...

Page 5: ...ed as the drive wheel Standard fasteners available at most hardware departments Parts shipped open account to qualified accounts All others cash with order or parts will be shipped C O D at prevailing prices at time of shipment Exploded View Read Before Using Rate Dial Adjustment Dial Setting Information The RATE DIAL has 9 numbers with 10 stops between each number for accurate control of the spre...

Page 6: ...er around spinner shaft before inserting agitator See page 8 OIL BEARINGS AND ALL MOVING PARTS Make certain the spreader is running freely 10 Item Part Quantity Description 1 SL HP 1205 1 Hopper Only 304 Stainless Steel 2 SS 90 0011 6 1 4 20 X 1 1 4 Bolt 3 SS 90 0012 3 1 4 20 X 1 1 2 Bolt 4 SS 91 0004 10 1 4 20 Lock Nut 5 SS 94 0007 1 Hopper Bottom Bearings 6 05 94 0068 1 Rate Gate 7 SS 94 0004 2 ...

Page 7: ... turn around area an area to re align the spreader for the return spread Example is for 6 ft wide spread Make the first spreading pass at one half the spread width from the edge of the spreading area or in this case approximately 3 feet or one big step Additional spreading passes will be at the full spread width or approximately 6 feet apart TAKE A SIGHTING AT THE FAR END Keep your eye on the sigh...

Page 8: ...of the item The sole and exclusive remedy against Spyker Spreaders LLC being the replacement of the defective parts This warranty gives you specific legal rights and you may also have other rights which vary from state to state THIS EXPRESS WARRANTY WHICH IS APPLICABLE ONLY TO THE ORIGINAL PURCHASE IS IN LIEU OF AND EXCLUDES ALL OTHER WARRANTIES WHETHER EXPRESSED OR IMPLIED BY OPERATION OF LAW OR ...

Reviews: