
15.
Check for proper alignment. Tighten ALL nuts
and bolts at this time.
16.
Attach lever control
assembly (34) to the
right hand side of
T-handle (30) using
(2) 3/8” x (1
1
/
8
”) bolt
and nut.
Tighten securely.
17.
Rate gate adjustment
procedure
New Linkage Adjustment Procedure
1. Set regulator dial to 1.
2. Set lever completely to off position.
3. Attach cable clamp to ground prop
with 1
1
/
4
” bolt and nut and finger
tighten.
4. Route cable through clamp, then
through swivel and then tighten the
cable clamp bolt just enough to allow
the cable to slide back and forth easily.
5. Adjust sheath on cable so there is a
1/8" inch of control wire that is visible
between the sheath and the edge of
the rate gate linkage.
6
6. Tighten the cable clamp bolt to
secure the sheath.
7. Tighten the screw on the swivel
to anchor the wire, making sure
that the rate gate linkage is
pushed up against the dial.
8. Trim excess wire behind swivel
connector when finished
(if necessary).
Read Before Using
Read Before Using
Spreader Assembly
11.
Connect ground prop
to center section
using (1) 1
1
/
4
” bolt
and nut. The flattened
side of the ground
prop should be on the
opposite side as the
T-handle labels.
12.
Now use the 1
1
/
2
” bolt
and install support
braces (27) loosely to
handle assembly
14.
Secure the braces
(27) loosely to the
frame with a 1
1
/
2
”
bolt and nut.
Braces must be on
the inside of the
frame.
13.
Position the spreader
as shown. Join the
handle loosely to the
crossbar, using the
1
1
/
2
” bolt.
5