1
1
J06
J06
J07
J08
Z01
49
2
J06
J02
L07
L07
L03A
PART
NO
QTY
J06
6
J07
6
J08
6
6
Ø
4X14
Z01
1
3
2
2
1
3
2
1
3
3
1
2
Drill a hole in L01A and L01B,
approximately 2.5mm diameter
and 700mm up from the bottom.
Fix the J08 downpipe bracket
with Z01 screws and then clip
the J06 downpipe into the J08
bracket.
Use silicone sealant around J02
and J06 to avoid water leaking.
You can use silicone sealant
around the downpipe bends
to avoid water leaking.