background image

21

B

J02

L07

L07

L01A

B

J02

L07

L07

L01A

1

2

S02X3pcs

PART

NO

QTY

L07

6

B

6

J02

6

3

S01

M6X12

1

L07

1

L07

L07

L07

L07

L07

1

1

1

1

Make sure
you pay
close attention
to the direction
of the pins

Assemble the L07 and L01A with connector B, insert 
connector B into L01A and L07, tighten the bolt with 
the spanner (provided).

L10

Slide the S01 bolts (3PCS) into 
the channel of the L07 that is
installed directly above the L10.

The J02 also needs to be installed at the same time.

Summary of Contents for Small Circle

Page 1: ...MODEL Small Circle PRODUCT SIZE LxWxH 320x283x275cm PLEASE READ CAREFULLY BEFORE ASSEMBLY Assembly Instructions Small Circle Greenhouse...

Page 2: ...bly Advice Page 1 2 Product Features Page 2 3 3 Part Lists Page 4 7 4 Roof Vents Assembly Page 8 12 6 Doors Assembly Page 13 16 7 Base Assembly Page 17 18 8 Framework Assembly Page 19 39 9 Panels Asse...

Page 3: ...ges Please be careful when handling components Always wear gloves shoes and safety goggles during assembly 3 DO NOT climb or stand on the roof heavy articles should not be leaned against the greenhous...

Page 4: ...capping Functions and Features 1 Compared with traditional greenhouses this exciting new product features many significant improvements The hollow box profile aluminium framing is much stronger than o...

Page 5: ...ve approximately 2 inches of film from all sheet edges before installing and remove all film immediately after the construction is completed Please ensure that the side with the white film faces outwa...

Page 6: ...4 PART NO QTY L08A 5 L10 1 J01 6 L01A 6 L07 6 B 6 J02 6 3 S01 M6X12 A 6 ALU Box No 1 ALU Box No 1...

Page 7: ...5 ALU Box No 2 ALU Box No 2 PART NO QTY L02A 6 L23A 12 L23B 14 L23C 35 K 34 L23D 44 L02K 11 1 W01 W11 6 S01 M6X12 6 M03 M6 6 6 L03A...

Page 8: ...1F 4 L11G 4 W06 2 J 8 4 Z03 4X10 Windowx2pcs PART NO QTY Door PART NO QTY S03 11 M8X60 W05 11 L16A 4 L17 1 L18A 1 L16B 4 L18C 1 L18D 2 L11H 4 L11J 4 4 4 4X40 Z04 D 2 S02 2 M8X30 M02 M8 2 J L02B 4 L02C...

Page 9: ...2 Y2 2 Y3 2 Y4 2 Y10 2 Y11 2 Y6 22 Y5 4 Y13 4 Y 6 Y 6 Y 6 Y 6 Y 1 Y 2 Y 3 Y 1 0 Y 4 Y 6 Y 6 Y 6 Y 6 Y 1 Y 2 Y 3 Y 1 0 Y 4 Y5 Y11 Y11 Y13 Y6 Y6 Y 5 Y 6 Y 6 Y 1 3 Y 6 Y 6 Y5 Y6 Y6 Y13 Y6 Y6 Y 5 Y 6 Y 6...

Page 10: ...PART NO QTY L19A 4 L19B 2 L20 2 L11F 4 L11G 4 W06 2 J 8 8 L20 L19B L19A L19A B B B B Y10 L11F L11F L11G L11G W06 4 Z03 4X10 Y10 2 Roof Vents Assembly 2PCS Aluminium Capping Panels Frames...

Page 11: ...J J 1 1 2 2 L20 J L19A J L19A L19B 1 2 Push down the button on connector J before inserting it into the end of the frame profile After connector J has been fitted use the hole in the profile to tighte...

Page 12: ...L11G L11G L11F L11F Y10 Y10 First the glazing panel Y10 should be loosely retained by the bar capping profiles L11F and L11G Next tap the bar capping gently into position with a rubber mallet L11F L1...

Page 13: ...11 Z03 Z03 W06 Y10 Y10 Fix the W06 vent handles using Z03 screws...

Page 14: ...12 Y10 Fill the gap with silicone sealant on 4 sides to avoid any leaking...

Page 15: ...PART NO QTY L16A 4 L17 1 L18A 1 L16B 4 L18C 1 L18D 2 PART NO QTY 4 PART NO QTY Y11 2 4 4X40 Z04 D 2 S02 2 M8X30 M02 M8 2 13 L11H 4 L11J 4 J Door Assembly...

Page 16: ...en assemble the door frames using connector J as shown in the sketches below Put L16A into L17 and L18D and put L16B into L18A and L18C Push down the button on connector J before inserting it into the...

Page 17: ...1 Y11 Y11 Y11 L11H L11H L11H L11H L11J L11J First the glazing panels should be loosely retained by the bar capping profiles L11H and L11J Next tap the bar capping gently into position with a rubber ma...

Page 18: ...mm 29mm 29mm 1 1 1 1 After Assembly This is the method of adjusting the door height Slide 2xS02 into L18D positioned 100mm away from each edge Secure S02 using M02 bolts then rotate the wheels to ensu...

Page 19: ...the dimensions a b c are the same to ensure the base is square Expansion bolt in concrete Support at the corners only is inadequate Steel pegs in soil We recommend a timber plinth be used and secured...

Page 20: ...3 9 5 3 9 5 3 9 5 395 3 9 5 3 9 5 3 9 5 3 9 5 2762 1mm L10 63 7mm 2634 7mm 2804 7mm 3042 3mm 1594 7mm 3189 4mm 106 3mm This shows the outer inner dimensions of this product which helps build up the op...

Page 21: ...um profiles connectors and anchor brackets approximately in place Assemble all of the L08A and L10 with connecter A Insert connector A into L08A and L10 tighten the bolts with the spanner provided whe...

Page 22: ...NO QTY L01A 6 1 1 1 1 2 2 L01A L01A L01A L01A L01A L01A Assemble L01A with connector A insert connector A into L01A tighten the bolt with the spanner provided when it s in the right position Make sure...

Page 23: ...e sure you pay close attention to the direction of the pins Assemble the L07 and L01A with connector B insert connector B into L01A and L07 tighten the bolt with the spanner provided L10 Slide the S01...

Page 24: ...Y L23A 6 L23B 12 L07 L08A L10 L23A L23B L23B L23B L23A L23B L10 L08A Tap the coverstrip L23B into L10 L08A and L07 and L23A into L01A gently with a rubber mallet Please pay attention to the direction...

Page 25: ...RT NO QTY L23C 24 L23C L23C L23C L23C 1 2 L08A L10 Tap the coverstrip L23C into L10 and L08A gently with a rubber mallet Make sure you leave 50mm between the two L23C in the middle to allow installati...

Page 26: ...A L02A L02A L02A 1 2 Put the connector K into the slot of L07 L10 and L08A rotate the connector until it slots into the channel as per the diagram on the left Tighten the bolt in the connector K with...

Page 27: ...m 50mm PART NO QTY L23D 40 L23D L23D Tap the coverstrip L23D into L01A and L02A gently with a rubber mallet Make sure you leave 50mm between the two L23D in the middle Do the same on the other profile...

Page 28: ...1A L02A L01A L01A L02A L01A L23D L23A Tap the coverstrip L23A and L23D into L01A and L02A gently with a rubber mallet Make sure you leave 50mm between the two L23D in the middle Do the same on the oth...

Page 29: ...02K 11 K 22 L02K L02K L02K Put the connector K into the slot of L02A and L01A rotate the connector until it slots into the channel as per the diagram on the left Tighten the bolt in the connector K wi...

Page 30: ...28 L23C L02K PART NO QTY L23C 11 L23C Tap the coverstrip L23C into L02K gently with a rubber mallet...

Page 31: ...M6X12 2 L03A L03A W01 L03A S01 W11 W01 L03A J02 L07 L07 L03A M03 M6 2 M03 1 W01 Assemble the L03A with the connector B insert connector B into L03A tighten the bolt with the spanner provided Remember...

Page 32: ...30 PART NO QTY 4 L03A W11 4 S01 M6X12 4 M03 M6 4 M03 L03A Do the same for the remaining L03A profiles...

Page 33: ...31 1 2 3 W04 W04 PART NO QTY 1 W04 1 Auto Cap Assembly Install the Auto Opener cylinder through the central hole on W01 Fig 1 Auto Opener Auto Opener Insert the split pin to secure it in place Fig 2 3...

Page 34: ...L07 gently with a rubber mallet Make sure you leave 50mm between the two L24B in the middle to allow installation of the L02D later Repeat the process on the other side where the vent is to be install...

Page 35: ...and L25B into L02E gently with a rubber mallet Make sure you leave 50mm between the two L25A in the middle to allow installation of the L02C later and leave 578mm between the two L25B in the middle to...

Page 36: ...agram on the left Slide in Tighten up L03A Put the connector K into the slot of L07 Tighten the bolt in the connector K with the spanner Put the connector N into the slot of L03A rotate the connector...

Page 37: ...L02D L25C L25E L25D L25D PART NO QTY L25C 2 L25D 4 L25E 2 Tap the coverstrips L25C into L02C L25D into L02D and L25E into L02E gently with a rubber mallet Do the same on the other side where the vent...

Page 38: ...L07 L07 L24C L24C 50mm Tap the coverstrips L24C into L07 gently with a rubber mallet Make sure you leave 50mm between the two L24C in the middle Do the same on the other profiles L07 L07 to allow inst...

Page 39: ...7 L02B 4 K 4 W11 4 S01 M6X12 4 M03 M6 4 Do the same on the other profiles Slide in Tighten up Put the connector K into the slot of L07 Tighten the bolt in the connector K rotate the connector until it...

Page 40: ...38 PART NO QTY L24D 4 L24D L02B L24D Tap the coverstrips L24D into L02B gently with a rubber mallet Do the same on the other sides...

Page 41: ...rame is now complete Once you start the glazing ensure that you complete it Do not leave the greenhouse half glazed as it can be more exposed to the weather Opener Auto Opener Auto Opener push it thro...

Page 42: ...1B 4 2 L12C 4 L12D Y1 2 L09 2 2 L22 Y2 2 Y3 2 Y4 2 Y1 Y2 Y3 Y4 L12D L09 L11B L12C L22 Panel Assembly Install the panels and aluminum bar capping in order as shown above tap the bar capping into the ch...

Page 43: ...41 Silicone sealant can help seal at these points to prevent any leaking NOTE ENSURE A POLYCARBONATE SUITABLE SILICONE IS USED...

Page 44: ...9 PART NO QTY L11B 8 4 L12B Y5 4 L09 4 Y13 4 L12B L11B L11B L09 Y5 Y13 Install the panels and aluminum bar capping in order as shown above tap the bar capping into the channels with a rubber hammer Do...

Page 45: ...43 Silicone sealant can help seal at these points to prevent any leaking NOTE ENSURE A POLYCARBONATE SUITABLE SILICONE IS USED...

Page 46: ...along the groove in the L22 and fix it in the correct position using Z03 screws Ensure the manual vent is closed as shown Use a screw S01 to pass through Part Z and then put part Z 2pcs into the slot...

Page 47: ...QTY L11A 10 5 L12A L11D 10 10 L12K Y6 20 PART NO QTY L12K L11A L12K L12A L11A L11D L11D Install the panels Y6 and aluminum bar capping in order as shown above tap the bar capping into the channels wi...

Page 48: ...Y6 Y6 Y6 PART NO QTY L11A 1 1 L12A L11E 1 1 L12K Y6 2 PART NO QTY L11E L12K L12A L11A Install the panels Y6 and aluminum bar capping in order as shown above tap the bar capping into the channels with...

Page 49: ...47 L14 D L14 Door M03 M03 1 PART NO QTY L14 1 M03 M6 3 L14 L09 L18D 1 1 1 M01 M01 M6 3 Rotate D the roller wheels to adjust the height of the door so it does not bind or rub on the bottom track...

Page 50: ...2 W03 L14 L07 W01 W02 1 3 PART NO QTY W03 2 4 4X14D Z02 1 2 3 2 L07 Z02 W03 L14 L04A L04A L04A L04A 1 Turn the Auto Opener cylinder counter clockwise to adjust the gap between the W02 and L03A Auto Op...

Page 51: ...a hole in L01A and L01B approximately 2 5mm diameter and 700mm up from the bottom Fix the J08 downpipe bracket with Z01 screws and then clip the J06 downpipe into the J08 bracket Use silicone sealant...

Reviews: