background image

 
  
 

January 29, 2019  

 

 

511-146P ROPE CLIMB 

INSTALLATION INSTRUCTION 

 

INSTALLATION STEPS CONTINUED 

__6) 

Install Swing Hanger:

 After the cement has dried you can install 

the Swing Hanger. Thread the 1’ 4/0 Chain through the loop of the 
unsecured end of the Rope. Use the Clevis Key (8) to remove the bolt of 
the D Shackle. Thread the ends of the 1’ 4/0 Chain to the D Shackle. 
Attach the D Shackle to the eye of the Swing Hanger. Note: This is 
maybe a tight fit. A hammer may be needed to tap together. Reattach the 
bolt of the D shackle. Assemble the Swing Hanger to the Sliding Pole. 
The Swing Hanger edge should be 2” from the edge of the Sliding Pole.   
(See Detail A) 

__7) 

Once the concrete has set

, back fill dirt over the footing holes; 

inspect the area and components for tools, hazardous debris and sharp 
edges.  Verify all components are installed and all hardware is tight and 
then install the safety surfacing. 

__8)  

Inspect the components:

 for sharp edges and if necessary file them 

down and apply touch up paint.  

__9) 

Insert 2-3/8” Pipe Plug 

into the exposed end of the Sliding Pole. 

__10) 

Attach Labels

: Attach Warning Label and Manufacturer’s 

Identification Label to a clean surface. The labels should be attached in a 
location clearly visible and away from normal hand and foot placement 
areas. The labels must be replaced if they become illegible, destroyed, or 
removed. Contact your distributor for replacements. 

 

 

Reviews: