January 29, 2019
7
511-146P ROPE CLIMB
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__6)
Install Swing Hanger:
After the cement has dried you can install
the Swing Hanger. Thread the 1’ 4/0 Chain through the loop of the
unsecured end of the Rope. Use the Clevis Key (8) to remove the bolt of
the D Shackle. Thread the ends of the 1’ 4/0 Chain to the D Shackle.
Attach the D Shackle to the eye of the Swing Hanger. Note: This is
maybe a tight fit. A hammer may be needed to tap together. Reattach the
bolt of the D shackle. Assemble the Swing Hanger to the Sliding Pole.
The Swing Hanger edge should be 2” from the edge of the Sliding Pole.
(See Detail A)
__7)
Once the concrete has set
, back fill dirt over the footing holes;
inspect the area and components for tools, hazardous debris and sharp
edges. Verify all components are installed and all hardware is tight and
then install the safety surfacing.
__8)
Inspect the components:
for sharp edges and if necessary file them
down and apply touch up paint.
__9)
Insert 2-3/8” Pipe Plug
into the exposed end of the Sliding Pole.
__10)
Attach Labels
: Attach Warning Label and Manufacturer’s
Identification Label to a clean surface. The labels should be attached in a
location clearly visible and away from normal hand and foot placement
areas. The labels must be replaced if they become illegible, destroyed, or
removed. Contact your distributor for replacements.