![background image](http://html.mh-extra.com/html/spm/ice-dream-1/ice-dream-1_operators-manual_1349085052.webp)
Data di emissione:
Aprile, 2011
Revisione:
1
Pag. :
52/124
12. SPECIAL MAINTENTANCE
Caution
Before proceeding with any maintenance
operation, it is compulsory to switch off the
machine and unplug it from the mains.
Condenser cleaning
In order to guarantee good cooling system
performance, the condenser must be well
cleaned
every month
.
How to reach it:
- Switch off the power supply and disconnect
the power cable;
- Unscrew the knob (K) in order to remove the
back panel (see figure 27).
- Remove the dust inside the condenser fins and
clean it with a vacuum cleaner (fig.28).
- Restore the back panel.
!ATTENTION!
Failure to maintain a clean filter and
condenser will cause damage to the unit
and consequently void the warranty.
Luminous cover neon replacement
Replace the neon of the luminous cover,
according to the following procedures:
- Remove the small plastic cover AC as indicated
(fig.29).
- Carefully remove the lamp and replace it with
a new one.
- Reassemble the small cover AC.
- Place lid on machine and plug lid cord back
into lid.
Fig. 27
Fig. 28
Fig. 29
Summary of Contents for Ice Dream 1
Page 112: ...Data di emissione Aprile 2011 Revisione 1 Pag 112 124 15 WIRING DIAGRAMS ...
Page 113: ...Data di emissione Aprile 2011 Revisione 1 Pag 113 124 ...
Page 114: ...Data di emissione Aprile 2011 Revisione 1 Pag 114 124 ...
Page 115: ...Data di emissione Aprile 2011 Revisione 1 Pag 115 124 ...
Page 116: ...Data di emissione Aprile 2011 Revisione 1 Pag 116 124 ...
Page 117: ...Data di emissione Aprile 2011 Revisione 1 Pag 117 124 ...
Page 118: ...Data di emissione Aprile 2011 Revisione 1 Pag 118 124 ...
Page 119: ...Data di emissione Aprile 2011 Revisione 1 Pag 119 124 ...
Page 120: ...Data di emissione Aprile 2011 Revisione 1 Pag 120 124 ...
Page 121: ...Data di emissione Aprile 2011 Revisione 1 Pag 121 124 ...
Page 122: ...Data di emissione Aprile 2011 Revisione 1 Pag 122 124 ...