Setting up vibration measurements in Condmaster Ruby

1.  Go to 

Graphical Overview

 > 

View as tree

.

2.  In the tree structure to the left, expand 

Components

.

3.  Right-click Components, choose Create, and click 

Component

.

4.  Enter component number and name.
5.  Click 

Save

.

6.  Right-click the created component, choose Create, and click 

Measuring point

.

7.  Enter Measuring point number and name.
8.  Select a vibration measurement technique (Vibration, 2 or 3 channel vibration, or ISO 10816) and click 

Add

.

9.  Select 

Online

 under Instrument, select settings as desired, and click 

OK

.

10. Go to the 

Online

 tab, select the Airius sensor and direction (z, x, or y) under Address. Click 

OK

.

11. Go to the 

Settings

 tab, name the assignment, and edit the settings as desired.

12. For settings regarding conditions and filtering of results, go to the 

Online Advanced

 tab.

13. Go to 

RPM

 and enter fixed or variable speed (as a global value).

14. Click 

Save

.

For further information regarding these steps, see chapter 

Settings up measuring assignments for Airius vibration 

sensors

 in the 

Condmaster Ruby User Guide

.

Summary of Contents for AIR14-01

Page 1: ...1 i n f o s p m i n s t r u m e n t s e QUICKSTART Airius II LTE M ...

Page 2: ...rument com Technical data subject to change without notice ISO 9001 certified SPM 2021 10 72328 B Rev 0 Contents Technical specifications 3 Mechanical installation Airius vibration sensors 4 Setting up Airius 5 Setting up vibration measurements in Condmaster Ruby 7 Setting up vibration measurements in Condmaster NET 9 Replacing battery 10 ...

Page 3: ...iption with 3 years of data 10 1000 Hz 2 4 8 g AIR14 10 Airius II LTE M battery powered incl subscription with 3 years of data 2 5000 Hz 2 4 8 16 g AIR15 01 Airius II LTE M externally powered incl subscription with 3 years of data 10 1000 Hz 2 4 8 g AIR15 10 Airius II LTE M externally powered incl subscription with 3 years of data 2 5000 Hz 2 4 8 16 g Accessories 18470 Installation kit installatio...

Page 4: ...allation foot See table for sensor torque 6 If necessary adjust the installation foot so that the sensor s markings align with the intended measurement directions 7 If installing AIR15 connect an M12 connector to power the sensor Glue installation 1 Drill a counterbore with 30 mm diameter on the machine where the sensor should be placed 2 Screw the sensor onto the installation foot Tightening torq...

Page 5: ...n flashing means that the sensor is working When the connection to Condmaster Entity Server CES is successful the sensor flashes green The number of green flashes corresponds to the LTE M signal strength 1 flash poor 2 flashes average 3 flashes good If the connection is unsuccessful the sensor flashes red 1 flash could not connect to the server 2 flashes invalid subscription contact your sales rep...

Page 6: ...6 s p m i n s t r u m e n t c o m ...

Page 7: ...technique Vibration 2 or 3 channel vibration or ISO 10816 and click Add 9 Select Online under Instrument select settings as desired and click OK 10 Go to the Online tab select the Airius sensor and direction z x or y under Address Click OK 11 Go to the Settings tab name the assignment and edit the settings as desired 12 For settings regarding conditions and filtering of results go to the Online Ad...

Page 8: ...8 s p m i n s t r u m e n t c o m ...

Page 9: ...tails 10 Click Create 11 Select a name for the measuring assignment 12 Select an Airius sensor under Measuring unit 13 To edit measuring interval operational hours or measuring range for the Airius sensor click Edit unit settings 14 Mark the axes z x y to be measured 15 Select frequency range 16 Select spectrum unit 17 Set alarm limit for each condition parameter that should have an alarm limit 18...

Page 10: ...terfere with the battery replacement The lid is attached to the antenna cable that is attached to the circuit board at the other end 2 Loosen the two screws and remove the battery cover 3 Remove the battery and disconnect the plug 4 Connect the plug and insert the new battery 18572 5 Screw on the battery cover Tightening torque 0 5 Nm 6 Put the O ring in place and screw on the lid Tightening torqu...

Page 11: ...aste and is marked with a crossed out wheeled bin symbol in order to prevent it being discarded with household waste When the life cycle of the product is over You can return it to Your local SPM representative for correct treatment or dispose it together with your other electronic waste ...

Page 12: ...12 s p m i n s t r u m e n t c o m ...

Reviews: